Causes and penalties of variation: Case study of a precast concrete slab production facility

C Wang, M Liu, SM Hsiang… - Journal of construction …, 2012 - ascelibrary.org
Concrete precast plants require strict control over and adherence to the timing and
sequence of operations. Variation for this research is divided into the variation in task …

Causes of variation in construction project task starting times and duration

BW Wambeke, SM Hsiang, M Liu - Journal of construction …, 2011 - ascelibrary.org
In this research, variation is defined as the time difference between what was planned and
what actually happened in terms of task starting times and duration. Variation in construction …

Effects of production control strategy and duration variance on productivity and work in process: simulation-based investigation

K Hajifathalian, BW Wambeke, M Liu… - Journal of Construction …, 2012 - ascelibrary.org
Improving productivity and reducing work-in-process are two activities that can improve
project performance, but are often difficult to accomplish. The construction process is …

Impact of activity sequencing on reducing variability

SM Lindhard, F Hamzeh, VA Gonzalez… - Journal of …, 2019 - ascelibrary.org
Variation in production is a major cause of producing waste in onsite construction
operations, resulting in a workflow that is full of delays and interruptions. To reduce the …

Dynamic production scheduling model under due date uncertainty in precast concrete construction

T Kim, Y Kim, H Cho - Journal of Cleaner Production, 2020 - Elsevier
Precast concrete structures (PCs) are widely used in the construction industry to reduce
project delivery times and improve quality. On-time delivery of PCs is critical for successful …

[PDF][PDF] Sensitivity analysis of construction schedule performance due to increased change orders and decreased labor productivity

S Kermanshachi, B Rouhanizadeh - 7th CSCE International …, 2019 - academia.edu
In the initial steps of construction projects, contractors plan the construction processes and
timetables as accurately as possible; however, a number of change orders are inevitable. It …

Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality

MM Russell, SM Hsiang, M Liu… - Journal of Construction …, 2014 - ascelibrary.org
Due to the inherent nature of the construction industry, all construction projects have some
amount and type of uncertainty. This uncertainty can lead to variation in project task …

Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks

BW Wambeke, M Liu, SM Hsiang - Journal of Construction …, 2012 - ascelibrary.org
Variation, defined for this research as the time difference between what was planned and
what actually happened, is important as it can affect the productivity performance of …

Fabrication lead time and demand variability: An empirical study

CH Ko, G Ballard - Construction Research Congress 2005 …, 2005 - ascelibrary.org
This paper reports the methods and initial findings of an empirical study of fabrication lead
time and demand variability conducted with a precast concrete fabricator. The study is the …

Linear scheduling model with varying production rates

GA Duffy, GD Oberlender… - Journal of Construction …, 2011 - ascelibrary.org
Activity production rates drive the development and accuracy of linear schedules. The nature
of linear projects dictates an assortment of variables that affect each activity's production …