A Simulation-Based optimisation for contractors in precast concrete projects

S Chen, K Feng, W Lu - 10th Nordic Conference on Construction …, 2019 - emerald.com
A Simulation-Based Optimisation for Contractors in Precast Concrete Projects | Emerald Insight
Books and journals Case studies Expert Briefings Open Access Publish with us Advanced …

Simulation-optimization integrated approach to planning ready mixed concrete production and delivery: Validation and applications

M Lu, HC Lam - Proceedings of the 2009 Winter Simulation …, 2009 - ieeexplore.ieee.org
Powered by the simulation and optimization engines resulting from recent research, a
computer system named HKCONSIM is ready to provide concrete plant managers with …

Stability measure for prefab balancing in prefabrication construction supply chain management

W Zhang, C Yu, RY Zhong - Computers & Industrial Engineering, 2023 - Elsevier
Effective management of the prefabrication construction supply chain management
(PCSCM) requires careful consideration of rational resource allocation and Just-in-Time …

Improving the performance of precast concrete production processes by simultaneous implementation of lean techniques and root cause analysis

M Laika, G Heravi, M Rostami, S Ahmadi - Iranian Journal of Science and …, 2022 - Springer
On-site construction challenges and the efficient performance of off-site construction
methods have led the building industry toward applying different industrial construction …

Case study: transitory JIT at Proton cars, Malaysia

M Simpson, G Sykes, A Abdullah - International Journal of Physical …, 1998 - emerald.com
The paper describes and analyses the introduction of just‐in‐time (JIT) production at Proton
Cars, Malaysia. The paper examines the means of introducing JIT and the present scope of …

JIT implementation: a case study

D Garg, ON Kaul, SG Deshmukh - Production and Inventory …, 1998 - search.proquest.com
Within the last two decades, Just-in-Time (JIT) has been widely accepted as a valid tool in
manufacturing strategy in order to achieve competitiveness. A case study of an Indian tractor …

[PDF][PDF] Improving materials management practices on fast-track construction projects

NB Kasim, CJ Anumba, ARJ Dainty - 21st Annual ARCOM Conference …, 2005 - Citeseer
A key factor adversely affecting project performance is the improper handling and
management of materials on site. Materials management is particularly problematic on fast …

Dynamic transportation planning for prefabricated component supply chain

H Zhang, L Yu - Engineering, Construction and Architectural …, 2020 - emerald.com
Purpose Prefabricated construction concerns off-site production, multi-mode transportation
and on-site installation of the prefabricated components, which are interdependent and …

Simulation of a construction project: assessing impact of just-in-time and lean principles

F Bamana, N Lehoux, C Cloutier - Journal of Construction …, 2019 - ascelibrary.org
The construction industry is always searching for better ways to manage construction
projects and improve productivity while leaving a smaller ecological footprint. To help with …

Exploring lean construction component for Malaysian industrialized building system logistics management—A literature review

MANM Asri, MNM Nawi, R Saad… - Advanced Science …, 2016 - ingentaconnect.com
Inefficient logistic management can expose the project to the construction waste and
eventually can effects the project performance. Just in time (JIT) is excellent in managing the …