Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components

Z Wang, H Hu, J Gong - Automation in Construction, 2018 - Elsevier
Current precast production scheduling methodologies have limited applicability in practice
due to the neglect of real-world production circumstances. To improve, a two-hierarchy …

Optimized flowshop scheduling for precast production considering process connection and blocking

Y Dan, G Liu, Y Fu - Automation in Construction, 2021 - Elsevier
Precast production scheduling is a key issue in prefabricated construction. Process
connection and blocking are two characteristics of the flowshop production of precast …

Improved precast production–scheduling model considering the whole supply chain

Z Wang, H Hu - Journal of computing in civil engineering, 2017 - ascelibrary.org
Production scheduling plays a key role in the prefabricated construction productivity and on-
time delivery of precast components (PCs). However, the processes before and after the …

Dynamic response to demand variability for precast production rescheduling with multiple lines

Z Wang, H Hu - International Journal of Production Research, 2018 - Taylor & Francis
Production scheduling plays a crucial role in the prefabricated construction productivity and
on-time delivery of precast components (PCs). However, previous studies mainly focused on …

GA-based resource-constrained flow-shop scheduling model for mixed precast production

SS Leu, ST Hwang - Automation in construction, 2002 - Elsevier
Precast production tasks mainly consist of reinforcement cage prefabrication, form
fabrication, installment of reinforcement cages, mosaic or tiling fitting, placing concrete …

Precast production scheduling in off-site construction: Mainstream contents and optimization perspective

L Wang, Y Zhao, X Yin - Journal of Cleaner Production, 2023 - Elsevier
Precast production scheduling (PPS) is a key factor that enables efficient off-site construction
(OSC) and has received considerable attention from researchers. However, there is still a …

Dynamic production scheduling model under due date uncertainty in precast concrete construction

T Kim, Y Kim, H Cho - Journal of Cleaner Production, 2020 - Elsevier
Precast concrete structures (PCs) are widely used in the construction industry to reduce
project delivery times and improve quality. On-time delivery of PCs is critical for successful …

Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

M Yazdani, K Kabirifar, AM Fathollahi-Fard… - … Science and Pollution …, 2021 - Springer
The growing environmental concerns, excessive utilization of natural resources, and high
energy consumption have put a severe pressure on the construction industry to adopt new …

GA-based decision support systems for precast production planning

CH Ko, SF Wang - Automation in construction, 2010 - Elsevier
Appropriate production plans can produce effective resource utilization and minimize waste.
However, most precast fabricators currently propose production plans depending on the rule …

Genetic algorithm for determining the construction logistics of precast components

Y Fang, ST Ng - Engineering, Construction and Architectural …, 2019 - emerald.com
Purpose Precast construction has become increasingly popular in the construction industry.
Nonetheless, the logistics of construction materials has been a neglected topic, and this …