Minimum cost replacement and maintenance scheduling in dual-dissimilar-unit standby systems

G Levitin, L Xing, Y Dai - Reliability Engineering & System Safety, 2022 - Elsevier
Recent studies have shown that reusing standby elements during the mission may improve
the mission success probability significantly. However, such a benefit cannot be effectively …

Optimal multiple replacement and maintenance scheduling in two-unit systems

G Levitin, L Xing, Y Xiang - Reliability Engineering & System Safety, 2021 - Elsevier
This paper models and optimizes the replacement and maintenance schedule (RMS) for a
heterogeneous two-unit standby system. The system must accomplish a specified amount of …

Optimal operation and maintenance scheduling in m-out-of-n standby systems with reusable elements

G Levitin, L Xing, Y Dai - Reliability Engineering & System Safety, 2021 - Elsevier
Intensive research efforts have been dedicated to reliability analysis and optimization of
standby systems. However, only few of the existing models allow a system element to be …

Joint optimal mission aborting and replacement and maintenance scheduling in dual-unit standby systems

G Levitin, L Xing, Y Dai - Reliability Engineering & System Safety, 2021 - Elsevier
This paper models a dual-unit standby system with non-identical, reusable units that perform
the mission task alternatively according to a pre-specified replacement and maintenance …

Influence of storage on mission success probability of m-out-of-n standby systems with reusable elements

G Levitin, L Xing, Y Dai - Reliability Engineering & System Safety, 2021 - Elsevier
Recent studies have shown that elements reusing through preventive replacements is
beneficial in enhancing the mission success probability (MSP) of standby systems. While …

Optimal non-periodic replacement and reactivation in standby systems with protection and maintenance options

G Levitin, L Xing, Y Dai - Computers & Industrial Engineering, 2021 - Elsevier
Traditional standby system models have mostly assumed that each element can be online
and used once during the mission time. In practice especially when a long mission task is …

Reliability versus expected mission cost and uncompleted work in heterogeneous warm standby multiphase systems

G Levitin, L Xing, Y Dai - IEEE Transactions on Systems, Man …, 2016 - ieeexplore.ieee.org
This paper considers 1-out-of-N: G warm standby (WS) systems subject to multiple-phased
mission requirements, where performance, failure behavior, operation cost, replacement …

1-out-of-n standby systems with storages and activation moment-dependent component operation time limit

G Levitin, L Xing, Y Dai - Reliability Engineering & System Safety, 2024 - Elsevier
This paper pioneers the modeling and optimization of a 1-out-of-n standby system with a
required mission time and non-identical components, whose operation times are limited and …

Heterogeneous 1-out-of-N warm standby systems with dynamic uneven backups

G Levitin, L Xing, Y Dai - IEEE Transactions on Reliability, 2015 - ieeexplore.ieee.org
In this paper, mission reliability, expected mission completion time, and cost of non-
repairable 1-out-of-N: G warm standby sparing systems subject to uneven backup actions …

Non-Homogeneous 1-Out-of- Warm Standby Systems With Random Replacement Times

G Levitin, L Xing, Y Dai - IEEE Transactions on Reliability, 2015 - ieeexplore.ieee.org
In standby systems, when an online working element fails, a replacement procedure is
initiated to activate a standby unit which will take over the mission task to sustain the system …