Just-in-time manufacturing: literature review and directions

G Singh, IS Ahuja - … Journal of Business Continuity and Risk …, 2012 - inderscienceonline.com
The purpose of this paper is to review the literature on just-in-time (JIT) and to present a
general survey of JIT implementation practices adopted by the manufacturing organisations …

[图书][B] Takt time planning as a work structuring method to improve construction work flow

A Frandson - 2019 - search.proquest.com
Work structuring is critical to project production system design because it helps to define
who is doing what work, when, what the handoffs are, how they are doing the work, how …

The just-in-time philosophy: a literature review

DY Golhar, CL Stamm - The International Journal of Production …, 1991 - Taylor & Francis
The just-in-time (JIT) literature is reviewed to identify 211 refereed articles. To examine the
significance of JIT implementation, global productivity comparison articles are summarized …

[PDF][PDF] Short takt time in construction–a practical study

M Binninger, J Dlouhy, M Müller… - Proceedings of the …, 2018 - academia.edu
ABSTRACT Takt Planning and Takt Control (TPTC), as a method of Lean Construction, has
been developed over years and has increasing applications in construction practice over the …

Discussion of “Reducing variability to improve performance as a lean construction principle” by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de …

GA Howell, G Ballard, ID Tommelein… - Journal of construction …, 2004 - ascelibrary.org
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT©
ASCE/MARCH/APRIL 2004/299 ity in productivity (p. 152), but elsewhere (p. 144) also …

[PDF][PDF] History and theoretical foundations of takt planning and takt control

S Haghsheno, M Binninger, J Dlouhy… - Proceedings of the 24th …, 2016 - academia.edu
The use of Takt is one of the key methods applied in Lean Production. With the
implementation of Takt into processes overproduction is prevented, lead times are reduced …

Just‐in‐time implementation in the public sector: An empirical examination

MM Yasin, MA Wafa, MH Small - International Journal of Operations & …, 2001 - emerald.com
The effective implementation of just‐in‐time (JIT) in the US public sector is examined in this
empirical study. Specifically, the relationships between organizational modification efforts …

Implementing takt planning and takt control into residential construction

J Lehtovaara, I Mustonen, P Peuronen… - Annual Conference of …, 2019 - research.aalto.fi
This study addresses the suitability of takt planning and takt control (TPTC) for the interior
phase in residential construction projects. The purpose is to gain understanding on how to …

Just-in-time management of precast concrete components

LS Pheng, CJ Chuan - Journal of construction engineering and …, 2001 - ascelibrary.org
The just-in-time (JIT) philosophy has tremendous potential for managing the movement of
precast concrete components from the prefabrication yard to, and within, the construction …

Difficulties of Just‐in‐Time Implementation: AClassification Scheme

F Safayeni, L Purdy, R van Engelen… - International Journal of …, 1991 - emerald.com
Many companies experience difficulty in implementing Just‐in‐Time (JIT) in their
manufacturing system. Based on observations, the articleargues that the problem is partly …