Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

M Yazdani, K Kabirifar, AM Fathollahi-Fard… - … Science and Pollution …, 2021 - Springer
The growing environmental concerns, excessive utilization of natural resources, and high
energy consumption have put a severe pressure on the construction industry to adopt new …

Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction

L Kong, H Li, H Luo, L Ding, X Zhang - Journal of cleaner production, 2018 - Elsevier
Despite a great deal of research into precast production scheduling published in academic
journals worldwide, little attention has been given to environmental performance related to …

Dynamic production scheduling model under due date uncertainty in precast concrete construction

T Kim, Y Kim, H Cho - Journal of Cleaner Production, 2020 - Elsevier
Precast concrete structures (PCs) are widely used in the construction industry to reduce
project delivery times and improve quality. On-time delivery of PCs is critical for successful …

Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components

Z Wang, H Hu, J Gong - Automation in Construction, 2018 - Elsevier
Current precast production scheduling methodologies have limited applicability in practice
due to the neglect of real-world production circumstances. To improve, a two-hierarchy …

Improved precast production–scheduling model considering the whole supply chain

Z Wang, H Hu - Journal of computing in civil engineering, 2017 - ascelibrary.org
Production scheduling plays a key role in the prefabricated construction productivity and on-
time delivery of precast components (PCs). However, the processes before and after the …

Scheduling optimization of prefabricated construction projects by genetic algorithm

L Xie, Y Chen, R Chang - Applied Sciences, 2021 - mdpi.com
Prefabricated buildings are the direction of the future development of the construction
industry and have received widespread attention. The effective execution of prefabricated …

Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates

L Kong, H Li, H Luo, L Ding, X Luo… - Automation in Construction, 2017 - Elsevier
The manufacture, transportation and on-site assembly sectors of precast construction
projects are often considered separately and managed by rule of thumb, causing an …

Genetic algorithm for determining the construction logistics of precast components

Y Fang, ST Ng - Engineering, Construction and Architectural …, 2019 - emerald.com
Purpose Precast construction has become increasingly popular in the construction industry.
Nonetheless, the logistics of construction materials has been a neglected topic, and this …

Dynamic response to demand variability for precast production rescheduling with multiple lines

Z Wang, H Hu - International Journal of Production Research, 2018 - Taylor & Francis
Production scheduling plays a crucial role in the prefabricated construction productivity and
on-time delivery of precast components (PCs). However, previous studies mainly focused on …

Flowshop scheduling optimization for multi-shift precast production with on-time delivery

Y Dan, G Liu, C Mao, K Li, P Xu - Engineering Applications of Artificial …, 2024 - Elsevier
With the increasing popularity of prefabricated construction around the world, precast plants
face increasingly complex production scenarios. Because it is important for precast …