hydraulic structures such as bridges and diversion channels are planned to be made in
recent years in the operating perimeter of the Ity mining company. A 1D-2D hydraulic model
was developed to design a diversion channel to cut a meander of the Cavally River in order
to ensure hydraulic operation similar to the initial conditions of the river (water levels, flow
and velocities). This model was designed with a flow rate of 240 m3/s and a Manning …