RFC 4925: Softwire Problem Statement

X Li, S Dawkins, D Ward, A Durand - 2007 - dl.acm.org
… This document captures the problem statement for the Softwires Working Group, which is …
solved by the standards developed by the Softwires Working Group. Some requirements (and …

RFC 8658: RADIUS Attributes for Softwire Mechanisms Based on Address plus Port (A+ P)

C Xie, T Li - 2019 - dl.acm.org
… In some deployments, the DHCP server may use the Accounting-Request to report the
softwire configuration returned to a requesting host to a AAA server. It is the responsibility of the …

RFC 5571: Softwire Hub and Spoke Deployment Framework with Layer Two Tunneling Protocol Version 2 (L2TPv2)

B Storer, M Dos Santos, L Toutain, J Tremblay - 2009 - dl.acm.org
This document describes the framework of the Softwire "Hub and Spoke" solution with the
Layer Two Tunneling Protocol version 2 (L2TPv2). The implementation details specified in this …

[PDF][PDF] Network Working Group B. Storer Request for Comments: 5571 C. Pignataro, Ed. Category: Standards Track M. Dos Santos Cisco Systems B. Stevant, Ed.

L Toutain, J Tremblay, S Hub, SD Framework - 2009 - otenet.gr
This document describes the framework of the Softwire" Hub and Spoke" solution with the
Layer Two Tunneling Protocol version 2 (L2TPv2). The implementation details specified in this …

[引用][C] Softwire S. Jiang, Ed. Internet-Draft Huawei Technologies Co., Ltd Intended status: Standards Track Y. Fu, Ed. Expires: May 11, 2019 CNNIC

B Liu, P Deacon, C Xie, T Li, M Boucadair - 2018

[引用][C] Softwire S. Jiang, Ed. Internet-Draft Huawei Technologies Co., Ltd Intended status: Standards Track Y. Fu, Ed. Expires: July 25, 2019 CNNIC

B Liu, P Deacon, C Xie, T Li, M Boucadair - 2019

[引用][C] Accounting on Softwires

B Stevant - draft-stevant-softwire-accounting-01 (work in progress), 2006

[引用][C] D. Binet," Accounting on Softwires

B Stevant, L Toutain, F Dupont - Work in Progress, 2009

[引用][C] Softwire Y. Lee Internet-Draft Comcast Intended status: Informational R. Maglione Expires: March 18, 2012 Telecom Italia

C Williams, C Jacquenet, M Boucadair - 2011

[引用][C] Softwire S. Jiang, Ed. Internet-Draft Huawei Technologies Co., Ltd Intended status: Standards Track Y. Fu, Ed. Expires: February 8, 2018 CNNIC

B Liu, P Deacon, C Xie, T Li - 2017