2015. The first cryomodule and two High Energy Beam Transfer lines (HEBT) were installed.
In addition, many of the subsystems of the normal conducting part of the post-accelerator
(REX) were renovated or refurbished. Following the hardware commissioning of the different
system** and, in preparation for the start of the physics program, many tests and
measurements were conducted as part of the beam commissioning program. The results of …