loading were numerically simulated using the ANSYS software. The alternate variant of
cross arms with one-meter sleeve span installed on both arms was considered as an
improvement study. By comparing both cross arms systems, it is found that the total
deformation was reduced from 127.49 mm to 95.367 mm by introducing the sleeve. Besides,
the stress level appears to be lowered in the cross arms with sleeve installed. The sleeve is …