Penentuan Lot Size Pemesanan Bahan Baku Dengan Batasan Kapasitas Gudang

DM Utama - Jurnal Ilmiah Teknik Industri, 2016 - journals.ums.ac.id
Jurnal Ilmiah Teknik Industri, 2016journals.ums.ac.id
This paper explains the problem of determining the lot size of ordering raw materials with
warehouse capacity limitation in order to minimize inventory costs. Generally, the lot size of
ordering raw materials determined without considering warehouse capacity. The algorithm
that used is Wagner Within (WW) which is modified by adding a warehouse capacity as a
constraint. The result shows the minimum of total inventory cost is 24,100 and the ordering
raw materials at the week 3, 5 and 7.
Abstract
This paper explains the problem of determining the lot size of ordering raw materials with warehouse capacity limitation in order to minimize inventory costs. Generally, the lot size of ordering raw materials determined without considering warehouse capacity. The algorithm that used is Wagner Within (WW) which is modified by adding a warehouse capacity as a constraint. The result shows the minimum of total inventory cost is 24,100 and the ordering raw materials at the week 3, 5 and 7.