seriously affect the environment with elevated levels of some physico-chemical variables in
perturbed segments of the river. The road construction resulted in elevated levels of the
three pollution parameters (turbidity, bed load and suspended load which also had
significant effect on the macroinvertebrate species richness and diversity in the perturbed
zone, Biotic scores and biomass of macroinvertebrates were lower at perturbed than …