Sizing gelant treatments in hydraulically fractured production wells

RS Seright, J Liang, M Seldal - SPE Production & Facilities, 1998 - onepetro.org
Often, when production wells are stimulated by hydraulic fracturing, the fracture
unintentionally breaks into water zones causing substantially increased water production. To
correct this problem, we developed an engineering basis for designing and sizing gelant
treatments in hydraulically fractured production wells. In these treatments, gelant penetrates
a short distance from the fracture face into the porous rock associated with both water and
hydrocarbon zones. Success for a given treatment requires that the gel reduce permeability …

[引用][C] Sizing Gelant Treatments in Hydraulically Fractured Production Wells. SPEPF 13 (4): 223–229

RS Seright, J Liang, M Seldal - 1998 - SPE-52398-PA. DOI: 10.2118/52398 …
以上显示的是最相近的搜索结果。 查看全部搜索结果