manual post-tensioning procedure by inserting a spring element at the post-tensioning steel
anchorage. This system is aimed at the following:(1) eliminate the need for specialized post-
tensioning equipment and the associated highly trained workers required in the construction
of the conventional rocking systems; and,(2) promote more sustainable seismic systems by
combing with renewable materials.