An Intelligent scheduling system and hybrid optimization algorithm for ship locks of the Three Gorges Hub on the Yangtze River

H Zhang, J Ke - Mechanical Systems and Signal Processing, 2024 - Elsevier
The ship lock system of the Three Gorges Hub (TGH) stands out as the most intricate
navigation system for ships passing through dams, which is composed of the the world's …

Optimizing lock operations and ship arrivals through multiple locks on inland waterways

H Guan, Y Xu, L Li, X Huang - Mathematical Problems in …, 2021 - Wiley Online Library
Locks are important components of a waterway system. To improve the efficiency of inland
waterway transport, it is important to ensure ships passing locks without having to spend …

A hybrid intelligent approach for co-scheduling of cascaded locks with multiple chambers

B Ji, X Yuan, Y Yuan - IEEE transactions on cybernetics, 2018 - ieeexplore.ieee.org
A complex and typical scheduling problem in waterway transportation: co-scheduling of
cascaded locks with multiple chambers (CCLM) is studied. Based on in-depth analysis of the …

Layered constraint united scheduling model of multi-line lock

X Pan - Cluster Computing, 2019 - Springer
Inland river multi-line lock united scheduling is an important issue during navigation, and
scheduling arrangement directly influences waterborne logistic efficiency. The research …

Two-level optimization to reduce waiting time at locks in inland waterway transportation

W Hammedi, SM Senouci, P Brunet… - ACM Transactions on …, 2022 - dl.acm.org
Inland vessels often have to cross numerous locks before reaching their final destination,
which leads to a significant delay and sometimes represents as much as half of the total …

Exact and heuristic methods for optimizing lock-quay system in inland waterway

B Ji, X Yuan, Y Yuan, X Lei, T Fernando… - European Journal of …, 2019 - Elsevier
This paper focuses on lock and quay co-scheduling problem (LQCP) so that delay time of
ships at a lock and time spent at the quay are minimized. The task can be regarded as a …

A co-scheduling problem of ship lift and ship lock at the Three Gorges Dam

X Zhao, Q Lin, H Yu - IEEE Access, 2020 - ieeexplore.ieee.org
Due to the unprecedentedly increasing demands of waterway transportation on the Yangtze
River during the latest years, traffic congestion at the Three Gorges Dam (TGD) has …

An adaptive large neighborhood search for solving generalized lock scheduling problem: Comparative study with exact methods

B Ji, X Yuan, Y Yuan, X Lei… - IEEE Transactions on …, 2019 - ieeexplore.ieee.org
The generalized lock scheduling problem (GLSP) is a mixed integer optimization problem
which consists of a ship placement (SP) and a lockage operation scheduling (LOS) sub …

Arrangement algorithm outside ship lock during ship scheduling

X Heng-hui, QI Huan, W Xiao-ping… - 交通运输工程 …, 2007 - transport.chd.edu.cn
In order to improve the navigation capacity of ship lock and optimize ship scheduling, the
average opening intervals of ship locks of Three Gorges Dam were analyzed, and a new …

Optimization scheduling model of double line Shiplock based on nonlinear goal programming

QH Pang, XY Wu - Journal of applied research and technology, 2014 - scielo.org.mx
The scheduling method of shiplock has a strong influence on the improvement of shiplock
capacity. On the condition that the number of the ships waiting for the lock was relatively …