Integration of two-stage assembly flow shop scheduling and vehicle routing using improved whale optimization algorithm

V Bahmani, MA Adibi… - Journal of applied research …, 2023 - journal-aprie.com
This paper provides an integrated model for a two-stage assembly flow shop scheduling
problem and distribution through vehicle routing in a soft time window. So, a mixed-integer …

Integrated hybrid flow shop scheduling and vehicle routing problem

R Moazami Goodarzi, F Ahmadizar, H Farughi - Journal of Industrial and …, 2021 - jise.ir
In this paper, a new integrated mathematical model for production and distribution planning
is presented to minimize tardiness and transportation costs. A mixed-integer linear …

Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time

GM Komaki, V Kayvanfar - Journal of computational science, 2015 - Elsevier
This article addresses the two-stage assembly flow shop scheduling problem with release
time of jobs which is applicable in many industrial areas, such as computer manufacturing …

Coordinated scheduling of production and transportation in a two-stage assembly flowshop

K Wang, WQ Ma, H Luo, H Qin - International journal of production …, 2016 - Taylor & Francis
To enhance the overall performance of supply chains, coordination among production and
distribution stages has recently received an increasing interest. This paper considers the …

Assembly flow shop scheduling problem considering machine eligibility restrictions and auxiliary resource constraints

SMH Hosseini, SS Sana, M Rostami - International journal of …, 2022 - Taylor & Francis
This paper investigates a two-stage production system consists of a fabrication stage
followed by an assembly stage. There are some unrelated parallel machines in the first …

Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality

F Jafari Nozar, J Behnamian - Engineering Optimization, 2021 - Taylor & Francis
In today's competitive environment, industrial units are seeking to reduce costs and increase
customer numbers; if their business involves perishable products, achieving these goals is …

[HTML][HTML] Multi-Stage assembly flow shop with setup time and release time

S Sheikh, GM Komaki, V Kayvanfar… - Operations Research …, 2019 - Elsevier
This article addresses multi-stage assembly flow shop for the first time. We propose several
industrial applications of this system in which the opening stage has m parallel machines …

Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance

H Seidgar, M Zandieh… - Proceedings of the …, 2016 - journals.sagepub.com
This article deals with the two-stage assembly flow shop problem considering preventive
maintenance activities and machine breakdowns. The objective is to minimize the …

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

SMH Hosseini - Journal of Industrial and Systems Engineering, 2017 - jise.ir
Scheduling for a two-stage production system is one of the most common problems in
production management. In this production system, a number of products are produced and …

Variable neighborhood search-based methods for integrated hybrid flow shop scheduling with distribution

S Wang, R Wu, F Chu, J Yu - Soft Computing, 2020 - Springer
With the rapid development of make-to-order pattern including E-commerce and takeout and
catering service in restaurants, the study of integrated scheduling and distribution receives …