An analytical approach to improving due-date and lead-time dynamics in production systems

N Duffie, J Bendul, M Knollmann - Journal of Manufacturing Systems, 2017 - Elsevier
A deterioration of due-date reliability is often attributed by planners to external causes rather
than to their own planning behavior. Particularly, planners tend to underestimate the effects …

Consequences of planned lead time adaptions in scope of the lead time syndrome of production control

K Windt, M Knollmann - CIRP Annals, 2014 - Elsevier
If order due dates are missed, a frequent reaction of production planners is to adapt planned
lead times. How often and to what extent updates are reasonable has previously been …

The Lead Time Syndrome of manufacturing control: comparison of two independent research approaches

J Bendul, M Knollmann - Procedia CIRP, 2016 - Elsevier
The aim of production planning and control is to ensure the achievement of the logistic
targets of high due date reliability, low lead times, high capacity utilization, and low WIP …

How to think about planned lead times

SC Graves - International Journal of Production Research, 2022 - Taylor & Francis
A fundamental construct of most planning systems is the planned lead time. A planned lead
time is a control parameter that refers to the planned amount of time for a production …

Evaluation of capacity control and planned lead time control in a control-theoretic model

M Knollmann, K Windt, N Duffie - Procedia CIRP, 2014 - Elsevier
Reducing lead time variability of production systems has been shown to be advantageous,
enabling constant flows and improved on time production. Nevertheless, fluctuating order …

Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?

M Thürer, NO Fernandes, S Haeussler… - International Journal of …, 2023 - Taylor & Francis
Many companies in practice want to dynamically adjust planned lead times in their
production planning and control systems in response to demand fluctuations. But for …

An explicit analysis of the lead time syndrome: stability condition and performance evaluation

B Selçuk, IJBF Adan, TG De Kok… - International journal of …, 2009 - Taylor & Francis
Updating planned lead times in response to changing workload levels leads to erratic
ordering behaviour, resulting in even larger variability in the workload levels and flow times …

The effect of updating lead times on the performance of hierarchical planning systems

B Selcuk, JC Fransoo, AG De Kok - International Journal of Production …, 2006 - Elsevier
In this study, our concern is to show the effect of updating lead times on the performance of a
two-level hierarchical planning system. Lead times are updated by taking periodic …

Valuation of leadtime reduction in multi-stage production systems

K Inderfurth - Operations Research in Production Planning and …, 1993 - Springer
Projects for leadtime reduction in production system have to be evaluated economically with
respect to their impact on logistic costs and customer service. In this paper a procedure for …

Lead time management

IP Tatsiopoulos, BG Kingsman - European Journal of Operational Research, 1983 - Elsevier
In intermittent production systems, job shops, manufacturing lead times are often long and
variable, yet only about 10% is due to the actual processing time. This is a major difficulty in …