Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches

Y Tian, T Xiong, Z Liu, Y Mei, L Wan - Computers & Industrial Engineering, 2022 - Elsevier
This paper proposes a new extension of the multi-skill resource-constrained project
scheduling problem: MS-RCPSP with skill switches. In real-world environment, the switch …

A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem

J Lin, L Zhu, K Gao - Expert Systems with Applications, 2020 - Elsevier
Multi-skill resource-constrained project scheduling problem (MS-RCPSP) is one of the most
investigated problems in operations research and management science. In this paper, a …

Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm

YY Li, J Lin, ZJ Wang - Applied Intelligence, 2022 - Springer
Multi-skill resource constrained project scheduling problem (MS-RCPSP) is one of the
widest investigated problems in manufacturing systems. This paper presents a multi …

A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem

L Zhu, J Lin, YY Li, ZJ Wang - Knowledge-based systems, 2021 - Elsevier
In this paper, an efficient decomposition-based multi-objective genetic programming hyper-
heuristic (MOGP-HH/D) approach is proposed for the multi-skill resource constrained project …

An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem

D Joshi, ML Mittal, MK Sharma… - Journal of Modelling in …, 2019 - emerald.com
Purpose The purpose of this paper is to consider one of the recent and practical extensions
of the resource-constrained project scheduling problem (RCPSP) termed as the multi-skill …

A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry

AH Hosseinian, V Baradaran - Engineering, Construction and …, 2023 - emerald.com
Purpose The purpose of this research is to study the Multi-Skill Resource-Constrained Multi-
Project Scheduling Problem (MSRCMPSP), where (1) durations of activities depend on the …

A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times

AH Hosseinian, V Baradaran - RAIRO-operations Research, 2021 - rairo-ro.org
This paper addresses the Multi-Skill Resource-Constrained Project Scheduling Problem
with Transfer Times (MSRCPSP-TT). A new model has been developed that incorporates …

[PDF][PDF] An evolutionary algorithm based on a hybrid multi-attribute decision making method for the multi-mode multi-skilled resource-constrained project scheduling …

AH Hosseinian, V Baradaran - Journal of Optimization in Industrial …, 2019 - sid.ir
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling
problem. Activities of real world projects often require more than one skill to be …

Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem

H Zheng, L Wang, X Zheng - Soft Computing, 2017 - Springer
In this paper, a teaching–learning-based optimization algorithm (TLBO) is proposed to solve
the multi-skill resource constrained project scheduling problem (MS-RCPSP) with makespan …

Resource constrained multi-project scheduling: A priority rule based evolutionary local search approach

RK Chakrabortty, RA Sarker, DL Essam - Intelligent and Evolutionary …, 2017 - Springer
This paper considers a static resource constrained multi-project scheduling problem
(RCMPSP) with two lateness objectives: project lateness and portfolio lateness. To solve the …