Safety management system: Development and validation of a multidimensional scale

B Fernández-Muñiz, JM Montes-Peon… - Journal of Loss …, 2007 - Elsevier
The literature has recognised that implementing a safety management system is the most
efficient way of allocating resources for safety, since it not only improves working conditions …

[PDF][PDF] SMS management system for direct sales and network marketing

VN Mee, ALI SELAMAT - Database, 2007 - eprints.utm.my
SMS management system in direct sales and network marketing is a concept of integrating
information system with mobile phone as well as using short message service (SMS) as a …

A development of performance metrics for forecasting schedule slippage

FJ Arcuri - 2007 - vtechworks.lib.vt.edu
Project schedules should mirror the project, as the project takes place. Accurate project
schedules, when updated and revised, reflect the actual progress of construction as …

[PDF][PDF] Risk management and analysis tools for construction sites

ALE Teo - CME 25 Conference Construction Management and …, 2007 - researchgate.net
Most of the monitoring tools for managing site safety used by local construction industry do
not allow for the different risk levels inherent in the factors contributing to accidents on sites …

[PDF][PDF] SMS Management System for Direct Sales and Network Marketing

ALI SELAMAT - researchgate.net
SMS management system in direct sales and network marketing is a concept of integrating
information system with mobile phone as well as using short message service (SMS) as a …

Developing an Electronic System to Enhance Building Safety Audits

EAL Teo - Architectural Science Review, 2007 - Taylor & Francis
The ability to prevent accidents can enhance construction sites as safer work places. The
key to preventing accidents is effective risk identification and management, requiring …

[PDF][PDF] Development of an Intellectual Framework for Schedule Control

F Arcuri, J Hildreth - 2007 - vdot.virginia.gov
Construction control systems provide a means to monitor progress, predict future status, and
act to influence the outcome. Functions fundamental can be used to describe control …

[PDF][PDF] Required Performance Method for Schedule Control

F Arcuri, J Hildreth - 2007 - vdot.virginia.gov
Abstract The Required Performance Method (RPM) is a forward-looking control system that
takes data from progress monitoring, applies the contractor's ability to expand work through …