Off-site construction optimization: Sequencing multiple job classes with time constraints

M Arashpour, R Wakefield, B Abbasi, EWM Lee… - Automation in …, 2016 - Elsevier
Off-site construction is a unique hybrid of manufacturing operations and on-site construction
activities. Maximizing the production output has long been the main challenge for off-site …

Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction

M Arashpour, R Wakefield, EWM Lee, R Chan… - International Journal of …, 2016 - Elsevier
Interaction and integration of uncertainties in on-site and off-site project activities often result
in the risk of delays and schedule overruns in hybrid construction projects. To address this …

Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects

V Priven, R Sacks - Journal of Construction Engineering and …, 2016 - ascelibrary.org
Despite empirical evidence of the effects of the Last Planner System.(LPS), the mechanisms
by which it works are less well understood. Its strengthening of the social networks within …

Quantitative analysis of rate-driven and due date–driven construction: Production efficiency, supervision, and controllability in residential projects

M Arashpour, R Wakefield, N Blismas… - Journal of Construction …, 2016 - ascelibrary.org
Concerns about production efficiency, quality, and affordability in the residential construction
indicate there may be benefits in adopting alternative production control strategies to those …

Estimating cumulative damages due to disruptions in repetitive construction

JS Lee - Journal of Construction Engineering and Management, 2016 - ascelibrary.org
Disruption to continuous workflow is a major cause of cost overruns affecting many
construction projects, especially for repetitive construction. The compensatory claims for …

Impacts to productivity in metal stud Framing, and the hanging and Finishing of gypsum Drywall

GH Williams, TR Anderson - 2016 Portland International …, 2016 - ieeexplore.ieee.org
Stud Framing, Drywall, and Tape and Finishing trade-work is a major component of every
building project. Labor productivity is the largest single variable affecting of the Framing and …

[引用][C] 工程返工管理的国际研究进展

张尚 - 建筑经济, 2016