Building construction projects worldwide routinely fail to meet their schedule and cost objectives. This paper focuses on design changes as the principal contributing factor to …
M Arashpour, B Abbasi, M Arashpour… - International journal of …, 2017 - Elsevier
Hybrid infrastructure projects are defined as triads of on-site/coordination/off-site project dimensions. Interaction of uncertainties in such settings result in deviations from project …
Modular construction methods, where products are manufactured beforehand in a factory and then transported to the site for installation, are becoming increasingly popular for …
Building information modeling (BIM) has long been utilized in the Architecture, Engineering and Construction (AEC) education. Learning and teaching (L & T) research has revealed a …
Senior managers fail to control time and costs of construction projects despite available advanced project management tools. Based on project management theory, the objective of …
M Arashpour, E Too, T Le - … Structural Engineering and …, 2017 - research.monash.edu
Construction industry has long dealt with problems such as low productivity, unstable workflow in projects and low utilization rate of resources. Off-site construction, which is a …
In the construction sector, researchers have studied methods to improve accuracy during the project planning stage in various areas such as estimation of material quantities and costs …