Flexible job-shop scheduling with tolerated time interval and limited starting time interval based on hybrid discrete PSO-SA: An application from a casting workshop

H Tang, R Chen, Y Li, Z Peng, S Guo, Y Du - Applied Soft Computing, 2019 - Elsevier
In this paper, we addressed two significant characteristics in practical casting production,
namely tolerated time interval (TTI) and limited starting time interval (LimSTI). With the …

A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem

L Zhu, J Lin, ZJ Wang - Applied Soft Computing, 2019 - Elsevier
In this paper, a discrete oppositional multi-verse optimization (DOMVO) algorithm is
proposed to address multi-skill resource constrained project scheduling problem (MS …

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

S Ahmadpour, V Ghezavati - Journal of Industrial Engineering …, 2019 - Springer
In this study, we aim to present a new model for the resource-constrained project scheduling
problem (RCPSP) considering a working calendar for project members and determined the …

A new approach for the multi-site resource-constrained project scheduling problem

C Stiti, OB Driss - Procedia Computer Science, 2019 - Elsevier
In recent years, the study of Resource Constrained Project Scheduling Problem RCPSP
which as a well-known NP-hard problem in project management and operational research is …

Integrated multi-project scheduling and hierarchical workforce allocation in the ETO assembly process

C Jiang, X Hu, J Xi - Applied Sciences, 2019 - mdpi.com
Featured Application With the increasing demand for customization, the engineer-to-order
(ETO) production strategy plays an increasingly important role in today's manufacturing …

A hybrid algorithm of product-service framework for the multi-project scheduling in ETO assembly process

C Jiang, X Hu, J Xi - Procedia CIRP, 2019 - Elsevier
The engineer-to-order (ETO) production strategy plays an important role in today's
manufacturing industry. This paper studies the multi-project scheduling in assembly process …

A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problem

B Sheng, H Wang, Z Xiao, C Zhang, F Zhao, X Yin - Soft Computing, 2019 - Springer
The resource-constrained project scheduling problem is one of the most intractable
problems in the field of operation research and management science. It is important for both …

Probability Mechanism Based Particle Swarm Optimization Algorithm and Its Application in Resource‐Constrained Project Scheduling Problems

S Li, Z Zhang, X Yan, L Zhang - Discrete Dynamics in Nature …, 2019 - Wiley Online Library
In this paper, a new probability mechanism based particle swarm optimization (PMPSO)
algorithm is proposed to solve combinatorial optimization problems. Based on the idea of …

Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems

GA Kim, YH Seo - The Journal of Information Systems, 2019 - koreascience.kr
Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in
project scheduling problems with a real basis. Design/methodology/approach Resource …