Schedule delay risk analysis in construction projects with a simulation-based expert system

GK Koulinas, AS Xanthopoulos, TT Tsilipiras… - Buildings, 2020 - mdpi.com
In this paper, we present a simulation-based approach for effectively estimating delay risks
in project schedules and predicting the possibilities of in-time project completion for various …

Comparing heuristic methods' performance for pure flow shop scheduling under certainand uncertain demand

F Nurprihatin, EL Jayadi, H Tannady - Management and production …, 2020 - journals.pan.pl
Production scheduling is assigning resources to complete the work and plays an important
role from a practical point of view [1]. It is logical that the competition between manufacturers …

Benchmarking and improving dimensional quality on modular construction projects–A case study

C Rausch, C Edwards, C Haas - International …, 2020 - journalofindustrializedconstruction …
Dimensional quality plays a key role in project success for modular construction. While
approaches exist for reducing rework associated with dimensional variability in traditional …

Tolerance management in construction: A conceptual framework

S Talebi, L Koskela, P Tzortzopoulos, M Kagioglou - Sustainability, 2020 - mdpi.com
Defects associated with dimensional and geometric tolerance variability (tolerance
problems) are often dealt with during the construction phase of projects. Despite the …

Deploying geometric dimensioning and tolerancing in construction

S Talebi, L Koskela, P Tzortzopoulos, M Kagioglou… - Buildings, 2020 - mdpi.com
No standardised approach appears to exist in the architecture, engineering, and
construction (AEC) industry for the communication of tolerance information on drawings. As …

Simulation modelling and analysis of impact of 3d feedback workflow on prefabrication of industrial construction

S Chuo - 2020 - uwspace.uwaterloo.ca
The construction industry has not been experiencing the same level of productivity increase
as the manufacturing industry, due to their divergent production methods. While traditional …

USO DE TÉCNICAS COMPUTACIONAIS NO APRIMORAMENTO DA TOMADA DE DICISÕES NO SETOR DE CONSTRUÇÃO: REVISÃO SISTEMÁTICA DA …

P Bezerra, S Scheer - ENCONTRO NACIONAL DE …, 2020 - eventos.antac.org.br
No mercado de construção, o uso de técnicas computacionais, oriundas da área de
Pesquisa Operacional, como forma de subsidiar a tomada de decisões tanto em fases de …

[PDF][PDF] Prefabrike Yapıların Tasarım, Üretim, Depolama, Nakliye ve Yapım Süreçlerini Etkileyen Faktörler

AY İlhami, GG AYALP - Teknik Dergi - researchgate.net
Prefabrikasyon, inşaat sektöründe sanayileşmenin başlangıcı olarak kabul edilir ve bu
süreçleri makineleşme, otomatik kontrol ve üretim takip etmektedir. Prefabrik inşaat …

Parallel Monte Carlo Simulation of VaR Calculation Based on Intel MIC Architecture

T Wen, R Mao, C Tan - 2020 International Conference on Big …, 2020 - ieeexplore.ieee.org
With regard to the research on financial risk management, Value-at-Risk (VaR) has been
widely accepted as a standard approach to financial risk management. There are various …

[图书][B] A novel mathematical layout optimisation method and design framework for modularisation in industrial process plants and SMRs

P Wrigley - 2020 - search.proquest.com
Nuclear power has been proposed as a low carbon solution to electricity generation when
intermittent wind and solar renewable energy are not generating. Nuclear can provide co …