A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem

M Ghasemi, RK Chakrabortty… - International Journal …, 2024 - Taylor & Francis
This paper addresses a multi-skilled extension of the multi-mode resource-constrained
project scheduling problem (MRCPSP) with preemption of activities and generalized …

The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes

Z Bahroun, R As'ad, M Tanash… - Management Systems in …, 2024 - sciendo.com
The Multi-skilled Resource Constrained Project Scheduling Problem (MS-RCPSP) is a
complex and multi-faceted problem that involves scheduling activities whilst considering …

Simulation-based comparison of push-and pull-based planning in panelized construction

Y Wei, Z Lei, MS Altaf - Automation in Construction, 2024 - Elsevier
Offsite construction involves the prefabrication of construction components in a factory
environment, followed by transportation to the construction site for assembly. In planning the …

[HTML][HTML] The effect of autonomous team role selection in flexible projects

ZT Kosztyán, P Harta, I Szalkai - Computers & Industrial Engineering, 2024 - Elsevier
Today, most software projects are flexible, such as agile, extreme, or hybrid. In addition, this
approach is increasingly being adopted for other types of projects. Most software project …

Modeling Volumetric Block Types in Residential Building Construction

P Oleynik, V Efimov - Applied Sciences, 2024 - mdpi.com
The article focuses on the erection of residential buildings from large-sized volumetric blocks
as a modern and progressive trend in housing construction. It is noted that one of the major …

Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study

S Rizaee, Z Lei - Journal of Construction Engineering and …, 2024 - ascelibrary.org
Accurate project duration estimation is crucial for effective scheduling, budgeting, resource
allocation, and overall construction management. Leveraging historical data from completed …

Strategic Workforce Planning for Production of Prefabricated Bathroom Units: An Advanced Markovian Approach

J Han, C Chen, RLK Tiong, K Wu… - Journal of Construction …, 2024 - ascelibrary.org
Producing prefabricated bathroom units (PBUs) involves a dry installation method that
heavily relies on human labor. Therefore, strategically accomplishing efficient and agile …

Multi-objective optimization of the level of prefabrication in construction projects

LG de Moura Jorge, AWA Hammad… - Proceedings of the …, 2024 - icevirtuallibrary.com
Off-site manufacturing (OSM) in construction projects is associated with significant
advantages including increased construction quality, productivity and efficiency. Even …

Trends and future directions of risk management approaches applied in modular construction projects: Systematic review and meta-analysis

S Khodabocus, S Seyis - Uludağ Üniversitesi Mühendislik Fakültesi …, 2024 - dergipark.org.tr
In modular construction, given the different undertakings compared to conventional
construction, the latter deems less risky. However, the current industry is faced with …

A Heuristic Algorithm for a Robust Resource-Constrained Project Scheduling Problem with Multi-Skilled Resources

W You, Z Xu, M Lu - Computing in Civil Engineering 2023 - ascelibrary.org
This paper studies a resource-constrained project scheduling problem with stochastic
activity durations and multi-skilled resource constraints. Robust project scheduling is …