Efficient initialization methods for population-based metaheuristic algorithms: A comparative study

JO Agushaka, AE Ezugwu, L Abualigah… - … Methods in Engineering, 2023 - Springer
The size, nature, and diversity of the initial population of population-based metaheuristic
algorithms and the number of times the algorithm iterates play a significant role in the …

Initialisation approaches for population-based metaheuristic algorithms: a comprehensive review

JO Agushaka, AE Ezugwu - Applied Sciences, 2022 - mdpi.com
A situation where the set of initial solutions lies near the position of the true optimality (most
favourable or desirable solution) by chance can increase the probability of finding the true …

Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model

PVH Son, NT Nguyen Dang - Scientific Reports, 2023 - nature.com
The analysis of the relationship between time and cost is a crucial aspect of construction
project management. Various optimization techniques have been developed to solve time …

Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution

DL Luong, DH Tran, PT Nguyen - International Journal of …, 2021 - Taylor & Francis
The time, cost and quality are crucial, conflicting aspects to construction project
management. Tradeoff optimization among project duration (time), project cost, and the …

Developing a national data-driven construction safety management framework with interpretable fatal accident prediction

K Koc, Ö Ekmekcioğlu, AP Gurgun - Journal of Construction …, 2023 - ascelibrary.org
Occupational accidents are frequent in the construction industry, containing significant risks
in the working environment. Therefore, early designation, taking preventive actions, and …

Optimization time-cost-quality-work continuity in construction management using mutation–crossover slime mold algorithm

PVH Son, LNQ Khoi - Applied Soft Computing, 2023 - Elsevier
This study presents the mutation–crossover slime mold algorithm (MCSMA) to balance the
time, cost, quality, and work continuity in a particular construction project. The slime mold …

Utilizing artificial intelligence to solving time–cost–quality trade-off problem

PVH Son, LNQ Khoi - Scientific Reports, 2022 - nature.com
This study presents the Slime Mold Algorithm (SMA) to solve the time—cost—quality trade-
off problem in a construction project. The proposed SMA is a flexible and efficient algorithm …

Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms

M Yılmaz, T Dede - Structures, 2023 - Elsevier
Determining the time and cost of activities is one of the most important stages of construction
project planning. Measures taken to shorten the time, such as the need for more or more …

Optimizing time, cost, and carbon in construction: grasshopper algorithm empowered with tournament selection and opposition-based learning

VHS Pham, P Vo Duy, NT Nguyen Dang - Scientific Reports, 2023 - nature.com
The global construction industry plays a pivotal role, yet its unique characteristics pose
distinctive challenges. Each construction project, marked by its individuality, substantial …

Optimizing time and cost simultaneously in projects with multi-verse optimizer

PVH Son, NT Nguyen Dang - Asian Journal of Civil Engineering, 2023 - Springer
Balancing time and cost has long been a primary focus of construction project management.
In this context, achieving optimal balancing time and cost objectives is crucial. The multi …