A shallow 2D-CNN network for crack detection in concrete structures

A Honarjoo, E Darvishan - International Journal of Structural Integrity, 2024 - emerald.com
Purpose This study aims to obtain methods to identify and find the place of damage, which is
one of the topics that has always been discussed in structural engineering. The cost of …

Multi-objective firefly optimization algorithm for construction site layout planning

A Ghadiri, D Sedaghat Shayegan… - Iranian Journal of …, 2022 - ijo.rasht.iau.ir
Safety importance on construction site layout plan is an essential requirement to improve
construction project management. In previous studies the safety objective function is …

Solving the Problem of Multi-Stakeholder Construction Site Layout Using Metaheuristic Algorithms

SS Shahebrahimi, A Lork, DS Shayegan, A Amir - powertechjournal.com
Construction site layout planning (CSLP) is crucial to projects' success and implementation.
The CSLP has an impact on time, cost, and quality from a project management standpoint …

Providing a Risk Assessment and Management Model for Water and Sewage Infrastructures with the Passive Defense Approach (Case Study: The border Province)

SE Abtahi, A Amirkardoost… - Journal of Water and …, 2024 - jwsd.um.ac.ir
The supply and distribution of sustainable drinking water is one of the most basic
responsibilities of governments, and the protection and maintenance of water supply and …

[PDF][PDF] Investigating the Effect of Supply Chain Stability on Assaluyeh Refineries Energy Efficiency

DS Shayegan, A Alipour… - Journal of Farayandno …, 2023 - farayandno.ir
The purpose of the current research is to investigate the impact of sustainability on energy
consumption in Asalouye plants, specifically focusing on the stability of the supply chain and …

[PDF][PDF] Risk assessment and management of oil and gas infrastructure in border provinces with the aim of reducing threat effects

SE Abtahi, R Kalhor, D Sedaghat Shayegan - Farayandno, 2022 - farayandno.ir
One of the most important strategies of any country for the integrated and comprehensive
development of all regions is the development of energy infrastructure with the aim of …

[引用][C] IMPACT OF CONSTRUCTION SITE LAYOUT PLANNING OPTIMIZATION ON CONSTRUCTION PROJECT MANAGEMENT (CASE STUDY OF LAUNCHER …

SS Shahebrahimi, A Lork, D Sedaghat Shayegan… - Int. J. Optim. Civil Eng, 2024