A review of methods, techniques and tools for project planning and control

R Pellerin, N Perrier - International Journal of Production Research, 2019 - Taylor & Francis
The purpose of this article is to provide a brief review of methods and techniques developed
for the most commonly studied decision-making problems in project planning and control …

Automated methods and systems for construction planning and scheduling: Critical review of three decades of research

F Amer, HY Koh, M Golparvar-Fard - Journal of Construction …, 2021 - ascelibrary.org
Over the last 3 decades, a large body of research focused on automated construction
planning and scheduling. Some of these efforts introduced methods to use design …

Digital twin-enabled real-time synchronization for planning, scheduling, and execution in precast on-site assembly

Y Jiang, M Li, M Li, X Liu, RY Zhong, W Pan… - Automation in …, 2022 - Elsevier
Planning, scheduling, and execution (PSE) are essential for coordinating tasks during on-
site assembly in prefabricated construction. Real-time synchronization supports …

A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects

S Monghasemi, MR Nikoo, MAK Fasaee… - Expert systems with …, 2015 - Elsevier
The planning phase of every construction project is entangled with multiple and occasionally
conflicting criteria which need to be optimized simultaneously. Multi-criterion decision …

The role of artificial intelligence in lean construction management

J Dumrak, SA Zarghami - Engineering, Construction and Architectural …, 2023 - emerald.com
Purpose The purpose of this article is to analyze the existing studies on the application of
artificial intelligence (AI) in lean construction management (LCM). Further, this study offers a …

Time–cost–quality trade-off analysis for planning construction projects

T Wang, M Abdallah, C Clevenger… - Engineering …, 2021 - emerald.com
Purpose Achieving project objectives in constructionprojects such as time, cost and quality is
a challenging task. Minimizing project cost often results in additional project duration and …

Off-site construction optimization: Sequencing multiple job classes with time constraints

M Arashpour, R Wakefield, B Abbasi, EWM Lee… - Automation in …, 2016 - Elsevier
Off-site construction is a unique hybrid of manufacturing operations and on-site construction
activities. Maximizing the production output has long been the main challenge for off-site …

Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects

K Sharma, MK Trivedi - International Journal of Construction …, 2022 - Taylor & Francis
Many researchers have paid significant amount of attention for the development of time-cost,
time-cost-quality and time–cost–safety trade-off optimization models. However, there is still a …

Resource constrained project scheduling with uncertain activity durations

RK Chakrabortty, RA Sarker, DL Essam - Computers & Industrial …, 2017 - Elsevier
In this paper, we consider Resource Constrained Project Scheduling Problems (RCPSPs)
with known deterministic renewable resource requirements but uncertain activity durations …

[HTML][HTML] Approaches for BIM-based multi-objective optimization in construction scheduling

N Essam, L Khodeir, F Fathy - Ain Shams Engineering Journal, 2023 - Elsevier
Construction scheduling is a complex process due to the interdependence and contradiction
of project activities. This requires applying population-based optimization algorithms like …