We address a manufacturing environment with the no-wait constraint which is common in industries such as metal, plastic, and semiconductor. Setup times are modelled as uncertain …
R Başar, O Engin - Engineering Optimization, 2024 - Taylor & Francis
The literature published since the year 2000 was reviewed regarding the no-wait flow-shop scheduling (No-WFSS) problem. The No-WFSS problem with separate set-up times and …
We conduct a novel investigation into the effects of uncertain health shocks and medical costs on the life cycle consumption, housing, and saving decisions. Our model aids in …
The four-machine flowshop scheduling problem is investigated with the objective of minimizing total completion time. Job processing times are uncertain where only the lower …
R Başar, O Engin - Journal of Advanced Research in Natural and …, 2022 - dergipark.org.tr
Beklemesiz Akış Tipi Çizelgeleme (BATÇ), pratik uygulamalarından dolayı kapsamlı bir araştırma alanıdır. BATÇ problemlerinde işler, makinelerde kesintisiz olarak işlem görmek …
M Allahverdi - RAIRO-Operations Research, 2023 - rairo-ro.org
The two-machine flowshop scheduling problem with the performance measure of total tardiness is addressed. This performance measure is essential since meeting deadlines is a …
A Mishra, D Shrivastava - Journal of Industrial and Management …, 2024 - aimsciences.org
Permutation flow shop scheduling problem (PFSP) is a well-known NP-hard problem with extensive engineering relevance. Consequently, various meta-heuristics have been …
Çizelgeleme problemleri, günümüzde üzerinde çokça durulan önemli bir konudur. Bu çalışmada Akış Tipi Çizelgeleme problemi, işlerin beklemesiz olma kısıtı ile ele alınmıştır …