An overview of recovery models and algorithms for real-time railway rescheduling

V Cacchiani, D Huisman, M Kidd, L Kroon… - … Research Part B …, 2014 - Elsevier
This paper presents an overview of recovery models and algorithms for real-time railway
disturbance and disruption management. This area is currently an active research area in …

Railway track allocation: models and methods

RM Lusby, J Larsen, M Ehrgott, D Ryan - OR spectrum, 2011 - Springer
Efficiently coordinating the movement of trains on a railway network is a central part of the
planning process for a railway company. This paper reviews models and methods that have …

[HTML][HTML] Futures of artificial intelligence through technology readiness levels

F Martínez-Plumed, E Gómez… - Telematics and …, 2021 - Elsevier
Artificial Intelligence (AI) offers the potential to transform our lives in radical ways. However,
the main unanswered questions about this foreseen transformation are its depth, breadth …

Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables

L Meng, X Zhou - Transportation Research Part B: Methodological, 2014 - Elsevier
Train dispatching is critical for the punctuality and reliability of rail operations, especially for
a complex rail network. This paper develops an innovative integer programming model for …

Integrating train scheduling and delay management in real-time railway traffic control

F Corman, A D'Ariano, AD Marra, D Pacciarelli… - … Research Part E …, 2017 - Elsevier
Optimization models for railway traffic rescheduling tackle the problem of determining, in real-
time, control actions to reducing the effect of disturbances in railway systems. In this field …

A survey on problem models and solution approaches to rescheduling in railway networks

W Fang, S Yang, X Yao - IEEE Transactions on Intelligent …, 2015 - ieeexplore.ieee.org
Rescheduling in railway networks is a challenging problem in both practice and theory. It
requires good quality solutions in reasonable computation time to resolve unexpected …

Rescheduling a metro line in an over-crowded situation after disruptions

Y Gao, L Kroon, M Schmidt, L Yang - Transportation Research Part B …, 2016 - Elsevier
In the case of a metro disruption, the planned timetable cannot be operated and a large
number of passengers are left stranded in the stations. When the disruption is over, some …

Train rescheduling for large-scale disruptions in a large-scale railway network

C Zhang, Y Gao, V Cacchiani, L Yang, Z Gao - … Research Part B …, 2023 - Elsevier
This paper studies the problem of rescheduling trains in a large-scale railway network with
the characteristics of long distance, long time horizon and a large number of trains, where a …

Collaborative optimization for train scheduling and train stop planning on high-speed railways

L Yang, J Qi, S Li, Y Gao - Omega, 2016 - Elsevier
Focusing on providing a modelling framework for train operation problems, this paper
proposes a new collaborative optimization method for both train stop planning and train …

A tabu search algorithm for rerouting trains during rail operations

F Corman, A D'Ariano, D Pacciarelli… - … Research Part B …, 2010 - Elsevier
This paper addresses the problem of train conflict detection and resolution, which is dealt
every day by traffic controllers to adapt the timetable to delays and other unpredictable …