Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground

J Rostami - Tunnelling and Underground Space Technology, 2016 - Elsevier
Performance prediction of TBMs is an essential part of project scheduling and cost
estimation. This process involves a good understanding of the complexities in the site …

[引用][C] TBM Tunnelling in Jointed and Faulted Rock

N Barton - AA Balkema, 2000 - books.google.com
This practical guide describes the stage-by-stage development of a method for predicting
the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an …

Development of a rock mass characteristics model for TBM penetration rate prediction

Q Gong, J Zhao - International journal of Rock mechanics and mining …, 2009 - Elsevier
The TBM tunneling process in hard rock is actually a rock or rock mass breakage process,
which determines the efficiency of tunnel boring machine (TBM). On the basis of the rock …

Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system

JK Hamidi, K Shahriar, B Rezai, J Rostami - Tunnelling and Underground …, 2010 - Elsevier
RMR is a simple rock mass classification system and is often used for characterization and
design purposes in preliminary stages of mining and civil engineering practices. However …

A study of various models used in the estimation of advance rates for hard rock TBMs

E Farrokh - Tunnelling and Underground Space Technology, 2020 - Elsevier
A realistic assessment of the time and cost to complete a tunnel using tunnel boring machine
(TBM) is directly related to the ability to accurately predict machine advance rate. Advance …

Study of various models for estimation of penetration rate of hard rock TBMs

E Farrokh, J Rostami, C Laughton - Tunnelling and Underground Space …, 2012 - Elsevier
Various approaches for predicting penetration rate of hard rock tunnel boring machines
(TBMs) have been studied by researchers since the early stages of TBM application in the …

Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic

E Ghasemi, S Yagiz, M Ataei - Bulletin of Engineering Geology and the …, 2014 - Springer
Predicting the penetration rate of a tunnel boring machine (TBM) plays an important role in
the economic and time planning of tunneling projects. In the past years, various empirical …

Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model

H Copur, H Aydin, N Bilgin, C Balci, D Tumac… - … and Underground Space …, 2014 - Elsevier
The current study is an attempt to address the stochastic nature of the rock excavation
process by suggesting a stochastic performance prediction model implemented into a …

Geological and mechanical rock mass conditions for TBM performance prediction. The case of “La Maddalena” exploratory tunnel, Chiomonte (Italy)

G Armetti, MR Migliazza, F Ferrari, A Berti… - … and Underground Space …, 2018 - Elsevier
Abstract The Tunnel Boring Machine (TBM) performance prediction is fundamental both to
select the most effective tunnel construction methods and to estimate the condition of …

Prediction model of tunnel boring machine performance by ensemble neural networks

Z Zhao, Q Gong, Y Zhang, J Zhao - … and Geoengineering: An …, 2007 - Taylor & Francis
The penetration rate of a tunnel boring machine (TBM) depends on many factors ranging
from the machine design to the geological properties. Therefore it may not be possible to …