Uprating of transmission lines by means of HTLS conductors for a sustainable growth: Challenges, opportunities, and research needs

JR Riba, S Bogarra, Á Gómez-Pau… - … and Sustainable Energy …, 2020 - Elsevier
This paper provides a comprehensive and critical review and evaluation of the technological
state-of-the-art of high-temperature low-sag (HTLS) conductors by analyzing research …

High‐performance hybrid genetic algorithm to solve transmission network expansion planning

LA Gallego, LP Garcés, M Rahmani… - IET Generation …, 2017 - Wiley Online Library
In this study, a high‐performance hybrid genetic algorithm (HGA) is proposed to solve static
and multistage transmission network expansion planning (TNEP) problem. The main …

A novel meta-heuristic model for the multi-year transmission network expansion planning

R Alvarez, C Rahmann, R Palma-Behnke… - International Journal of …, 2019 - Elsevier
The fast construction times of projects based on variable generation technologies (VGTs)
such as photovoltaic and wind generation, together with growing difficulties for building new …

Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors

S Nuchprayoon, A Chaichana - 2017 IEEE International …, 2017 - ieeexplore.ieee.org
This work presents cost evaluation of current uprating of overhead transmission lines by
using Aluminum Conductor Steel Reinforced (ACSR) and High Temperature Low Sag …

Performance comparison of using ACSR and HTLS conductors for current uprating of 230-kV overhead transmission lines

S Nuchprayoon, A Chaichana - 2018 IEEE International …, 2018 - ieeexplore.ieee.org
This work involves performance evaluation of current uprating of overhead transmission
lines by using Aluminum Conductor Steel Reinforced (ACSR) and High Temperature Low …

Stepwise investment plan optimization for large scale and multi-zonal transmission system expansion

H Ergun, B Rawn, R Belmans… - IEEE Transactions on …, 2015 - ieeexplore.ieee.org
This paper develops a long term transmission expansion optimization methodology taking
the probabilistic nature of generation and demand, spatial aspects of transmission …

Transmission Expansion Planning Considering Storage and Intraday Time Constraints to Integrate Wind Power

DH Huanca, DM Falcão - Journal of Electrical Engineering & Technology, 2024 - Springer
Energy storage systems (ESS) can be considered non-wire alternatives in power systems,
since they can smooth out the intermittency of wind power production and reduce …

[HTML][HTML] Planeamiento AC de la expansión de la red de transmisión considerando repotenciación de circuitos y ubicación de capacitores

JA López-López, DA Tejada-Arango… - TecnoLógicas, 2016 - scielo.org.co
En este artículo se aborda el problema de Planeamiento de la Expansión de la Red de
Transmisión (PERT). El PERT consiste en determinar el conjunto de nuevos circuitos …

HTLS İLETKENLERİN TEKNOEKONOMİK ANALİZİ

Y Akyol, A Bozkurt - Mühendislik Bilimleri ve Tasarım Dergisi, 2022 - dergipark.org.tr
Yüksek gerilim iletkenleri, enerji talebinde göz önünde bulundurulması gereken en önemli
unsurlardandır. Günümüzde elektrik enerjisine karşı artan talep, güç sistemlerinde kayıp …

Evaluation of regulatory impacts on investments of distributed generation and upstream network under uncertainty: a new stochastic bi-level model

F Misaghi, T Barforoushi - CIRED-Open Access Proceedings Journal, 2017 - IET
A new framework is proposed to study impacts of regulatory incentive policies on distributed
generation (DG) investment, as well as upgrading of upstream transmission substations and …