[HTML][HTML] Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity

J Feng, A Che, C Chu, E Levner, V Kats - European Journal of Operational …, 2024 - Elsevier
Robotic cell scheduling has received considerable attention from researchers. Several
existing review papers have presented then-existing studies on robotic cell scheduling and …

Scheduling multiple factory cranes on a common track

B Peterson, I Harjunkoski, S Hoda… - Computers & Operations …, 2014 - Elsevier
A heuristic algorithm is presented for scheduling the movement of multiple factory cranes
mounted on a common track. The cranes must complete a sequence of tasks at locations …

Dynamic hoist scheduling problem with multi-capacity reentrant machines: a mixed integer programming approach

J Feng, A Che, C Chu - Computers & Industrial Engineering, 2015 - Elsevier
This paper deals with the dynamic hoist scheduling problem with multi-capacity reentrant
machines, where some reentrant machines have parallel processing units and can process …

An improved mixed integer programming approach for multi-hoist cyclic scheduling problem

A Che, W Lei, J Feng, C Chu - IEEE Transactions on …, 2013 - ieeexplore.ieee.org
This paper addresses the single-track multi-hoist cyclic scheduling problem. In most existing
studies, loaded hoist moves are implicitly or explicitly assumed to start and end within the …

Real‐time dynamic hoist scheduling for multistage material handling process under uncertainties

C Zhao, J Fu, Q Xu - AIChE Journal, 2013 - Wiley Online Library
Multistage material handling processes are broadly used for manufacturing various
products/jobs, where hoists are commonly used to transport inline products according to …

An adapted variable neighborhood search based algorithm for the cyclic multi-hoist design and scheduling problem

E Laajili, S Lamrous, MA Manier, JM Nicod - Computers & Industrial …, 2021 - Elsevier
This paper studies both the design and the cyclic scheduling of multi-hoist treatment surface
facilities. Former research have always assumed that the design of the production line is …

A contract net based intelligent agent system for solving the reactive hoist scheduling problem

D Jégou, DW Kim, P Baptiste, KH Lee - Expert systems with applications, 2006 - Elsevier
In this article a new approach for solving the Reactive Hoist Scheduling Problem is
proposed. The investigation focuses on the case where multiple hoists, sharing the same …

Production-ratio oriented optimization for multi-recipe material handling via simultaneous hoist scheduling and production line arrangement

C Zhao, J Fu, Q Xu - Computers & chemical engineering, 2013 - Elsevier
In multi-recipe and multi-stage material handling (M3H) processes, such as electroplating
and polymeric coating, the productivity maximization under a customized production ratio of …

A new constraint programming model and solving for the cyclic hoist scheduling problem

M Wallace, N Yorke-Smith - Constraints, 2020 - Springer
The cyclic hoist scheduling problem (CHSP) is a well-studied optimisation problem due to its
importance in industry. Despite the wide range of solving techniques applied to the CHSP …

Environmentally conscious hoist scheduling for electroplating facilities

I Kuntay, Q Xu, K Uygun, Y Huang - Chemical Engineering …, 2006 - Taylor & Francis
Hoist scheduling in electroplating operations has long been considered a key factor for
improving the production rate. It has recently been recognized that hoist scheduling can also …