Analysis of Debris Flow Hazard in Volcanic Soil by the Flood Flows Modelling (DFLOWZ) and Nakayasu Synthetic Unit Hydrograph

IN Sinarta, PI Wahyuni… - … Review of Civil …, 2023 - repository.warmadewa.ac.id
The Mount Batur Geopark area is vulnerable to debris flow triggered by heavy rainfall and
weathered rocks that threaten the villages below. The estimation of the potential debris flow …

[PDF][PDF] 一个综合降水模型, 以确定雨量分布的使用情况, 作为计算设计洪水的数据输入

BH Mulyono, LM Limantara, M Sholichin… - 西南交通大学 …, 2022 - academia.edu
摘要在计算设计洪水排放量时, 工程师经常使用降雨数据的频率分布分析作为获得设计洪水量值
的基础. 雨站的分布是决定区域降雨量分布的一个重要因素; 然而, 并非所有的集水区都有足够的 …

Verification of a synthetic rainfall model based on the ArRR and satellite rainfall

BH Mulyono, LM Limantara, M Sholichin… - Journal of Hunan …, 2022 - jonuns.com
Synthetic rainfall is needed as an input in the analysis of design flood. This research intends
to conduct the verification of a synthetic rainfall model based on the ArRR and satellite …

Identification of Hydrological Characteristics and Sediment Rates of Bird Feather-Type Watersheds with SWAT Model: Case Study of Bomo River of Banyuwangi

Z Erwanto, D Iranata, MA Maulana - International Conference on …, 2023 - Springer
Banyuwangi Regency has many bird feather-type rivers due to topographic conditions which
are the valleys of Mount Ijen and Mount Raung so that they shape an elongated radial …

[引用][C] A synthetic precipitation model to determine the usage of the distribution of rain as a data input in calculating the design flood

BH Mulyono, LM Limantara, M Sholichin, D Sisinggih - Journal of Southwest Jiaotong …, 2022

[引用][C] The characteristic of watershed morphometry data for supporting the modification modeling of Nakayasu synthetic unit hydrograph

H Buana, LM Limantara, PT Juwono, M Sholichin - Journal of Southwest Jiaotong …, 2022

[引用][C] Time Lag Modeling in Modification of Nakayasu Synthetic Unit Hydrograph

H Buana, LM Limantara, PT Juwono, M Sholichin - Journal of Hunan University …, 2022