Dynamics of project-based collaborative networks for BIM implementation: Analysis based on stochastic actor-oriented models

D Cao, H Li, G Wang, X Luo, X Yang… - Journal of Management …, 2017 - ascelibrary.org
In the project-based construction industry, organizations are coupled with each other largely
through project-specific collaborative relationships, and the industry-level networks of these …

[PDF][PDF] Analyzing the lean principles in integrated planning and scheduling methods

M Sheikhkhoshkar, HB El-Haouzi, A Aubry… - Proc., 31th Annual …, 2023 - researchgate.net
The shortcomings and limitations of conventional planning and scheduling methods led to a
great deal of emphasis on combining them and developing integrated scheduling methods …

[PDF][PDF] Improving design coordination with lean and BIM an Indian case study

V Bhat, JS Trivedi, B Dave - … of the 26th Annual Conference of the …, 2018 - researchgate.net
ABSTRACT Building Information Modeling (BIM) and Lean construction principles have
been used independently as significant methods to construction process improvement. Their …

A self-adaptive agent-based dynamic processes simulation modelling framework

YL Loo, A Ahmad, A Mustapha… - 2021 4th International …, 2021 - ieeexplore.ieee.org
Traditional simulation modelling of dynamic processes aimed at domain-specific simulation
with specific simulation objectives. Studies of recent years uncovered drawbacks of domain …

Planlegging og oppfølging av prosjektering i ett sykehusprosjekt

L Omholt Volden - 2023 - ntnuopen.ntnu.no
Prosjektering av sykehusbygg koster lite sammenliknet med totale livsløpskostnader og har
stor påvirkning for driften av sykehuset. Det kan derfor argumenteres for at planlegging av …

[PDF][PDF] A influência organizacional sobre a qualidade do projeto do ambiente construído

LM Pereira - 2019 - researchgate.net
RESUMO PEREIRA, LM A influência organizacional sobre a qualidade do projeto do
ambiente construído. 2019. 367 f. Tese (Doutorado em Arquitetura e Urbanismo)–Instituto …

[PDF][PDF] Construction d'un protocole de collecte de données visuelle pour l'analyse de la collaboration au sein de projets d'architecture

J Rents, SB Rajeb - ModACT 2023, 2023 - popups.uliege.be
Dans cette étude de recherche participative, nous avons développé un protocole de collecte
de données pour comprendre les obstacles à la collaboration dans le secteur de …

[PDF][PDF] Suunnitteluaikataulut rakennushankkeen toteutussuunnitteluvaiheessa: aikataulutyökalu ja kommunikointi osana suunnittelunohjausprosessia

A Virkki - 2022 - theseus.fi
Opinnäytetyössä selvitetään rakennushankkeen toteutussuunnitteluvaiheen
suunnitteluaikataulujen luomiseen liittyvää suunnittelunohjausprosessia KVR-ja …

Hazard communication: what's the issue?: Integrating safety within the multidisciplinary design process

J Vegt - 2021 - essay.utwente.nl
As the construction industry worldwide keeps on claiming lives and injuries in multiple
phases of the building life cycle, researchers and practitioners have tried to bring safety …

[PDF][PDF] Suunnittelun johtaminen rakennushankkeessa

J Vikeväinen - 2020 - theseus.fi
Suunnittelu ja sen johtaminen vaikuttavat oleellisesti rakennushankkeen onnistumiseen.
Suunnitteluprosessin johtaminen koetaan usein haasteelliseksi tavanomaisessakin …