Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution

DL Luong, DH Tran, PT Nguyen - International Journal of …, 2021 - Taylor & Francis
The time, cost and quality are crucial, conflicting aspects to construction project
management. Tradeoff optimization among project duration (time), project cost, and the …

Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects

K Sharma, MK Trivedi - International Journal of Construction …, 2022 - Taylor & Francis
Many researchers have paid significant amount of attention for the development of time-cost,
time-cost-quality and time–cost–safety trade-off optimization models. However, there is still a …

Intelligent construction: unlocking opportunities for the digital transformation of China's construction industry

Z You - Engineering, Construction and Architectural …, 2024 - emerald.com
Purpose The existing literature has been mainly focused on local problems but without an
overall framework for studying the top-level planning of intelligent construction from a …

Generic scheduling optimization model for multiple construction projects

MS El-Abbasy, A Elazouni, T Zayed - Journal of computing in civil …, 2017 - ascelibrary.org
In the construction industry, contractors usually manage and execute multiple projects
simultaneously. Typically, this situation involves sharing different types of resources …

A scenario-based robust time–cost tradeoff model to handle the effect of COVID-19 on supply chains project management

SHR Hajiagha, HA Mahdiraji, M Behnam… - Operations Management …, 2022 - Springer
The COVID-19 pandemic outbreak deeply impressed supply chains in different aspects. In
response to this unexpected situation, supply chain managers have decided to recover and …

Flexible resource management and its effect on project cost and duration

DC Pinha, RS Ahluwalia - Journal of Industrial Engineering International, 2019 - Springer
In practice, most projects result in cost overruns and schedule slippage due to poor resource
management. This paper presents an approach that aims at reducing project duration and …

Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III

K Sharma, MK Trivedi - Asian Journal of Civil Engineering, 2023 - Springer
Significant amount of attention with several limitations has given to incorporate the
environmental impact, safety and quality parameters in construction time-cost trade-off. To …

Optimizing the cost-effectiveness of low impact development (LID) practices using an analytical probabilistic approach

J Zeng, G Huang, Y Mai, W Chen - Urban water journal, 2020 - Taylor & Francis
To select optimal LID in urban areas, an optimization assessment framework considering
hydrological processes and cost-effectiveness is proposed. To provide the desired runoff …

Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development

AP Behera, M Chauhan, G Shrivastava, P Singh… - Asian Journal of Civil …, 2024 - Springer
The construction industry faces the critical challenge of balancing project time, cost, and
carbon emissions to achieve sustainable development. This study introduces a Time–Cost …

[HTML][HTML] Multi-objective optimization in construction project management based on NSGA-III: pareto front development and decision-making

Z Zhan, Y Hu, P Xia, J Ding - Buildings, 2024 - mdpi.com
With the continuous improvement of construction management standards, thorough
investigation into various management objectives becomes crucial. To address the current …