Improving the accuracy of BIM-based quantity takeoff for compound elements

C Khosakitchalert, N Yabuki, T Fukuda - Automation in Construction, 2019 - Elsevier
Quantity takeoff based on Building Information Modeling (BIM) is a faster and more reliable
method than the traditional 2D-based quantity takeoff approach. However, the quality of BIM …

An integrated BIM-based approach for cost estimation in construction projects

A Fazeli, MS Dashti, F Jalaei… - Engineering, Construction …, 2021 - emerald.com
Purpose Analyzing different scenarios at the design stage of construction projects has
always been a challenging task. One of the main parameters that helps owners in making …

Integration of cost and work breakdown structures in the management of construction projects

A Cerezo-Narváez, A Pastor-Fernández… - Applied sciences, 2020 - mdpi.com
Scope management allows project managers to react when a project underperforms
regarding schedule, budget, and/or quality at the execution stage. Scope management can …

An integrated decision support system for building asset management based on BIM and Work Breakdown Structure

M Al-Kasasbeh, O Abudayyeh, H Liu - Journal of Building Engineering, 2021 - Elsevier
The asset management phase of a building constitutes approximately 60% of its total
lifecycle costs. However, significant unnecessary expenses occur in current asset …

BIM-based automated design and planning for boarding of light-frame residential buildings

H Liu, G Singh, M Lu, A Bouferguene… - Automation in …, 2018 - Elsevier
Building information modelling technology provides a game-changing solution to address
the challenges encountered in the AEC industry. However, this technology currently is not …

Automated modification of compound elements for accurate BIM-based quantity takeoff

C Khosakitchalert, N Yabuki, T Fukuda - Automation in Construction, 2020 - Elsevier
BIM-based quantity takeoff is faster, more accurate, and more reliable than traditional
quantity takeoff. However, the quality of BIM models is a major issue. Quantity takeoff is …

Automated 4D BIM development: The resource specification and optimization approach

A Fazeli, S Banihashemi, A Hajirasouli… - Engineering …, 2024 - emerald.com
Purpose This research aims to develop an automated and optimization algorithms (OAs)-
integrated 4D building information modeling (BIM) approach and a prototype and enable …

Investigating benefits and criticisms of BIM for construction scheduling in SMES: An Italian case study

G Malacarne, G Toller, C Marcher… - International Journal …, 2018 - books.google.com
Scheduling is one of the driving factors in the success of a construction project and it is a
critical step for all team members as it provides guidance to where and when they should …

A unified work breakdown structure-based framework for building asset management

M Al-Kasasbeh, O Abudayyeh, H Liu - Journal of Facilities …, 2020 - emerald.com
Purpose Asset inventory is an essential part of any building asset management system and
is needed by such functions as condition assessment and deterioration prediction. Previous …

Cost estimate system using structured query language in BIM

H Alzraiee - International Journal of Construction Management, 2022 - Taylor & Francis
Projects mainly fail due to inaccurate cost estimates. Building Information Modelling (BIM)
provides an opportunity to utilize its database to develop a reliable cost estimate. The …