Multivariate time-between-events monitoring: an overview and some overlooked underlying complexities

IM Zwetsloot, T Mahmood, WH Woodall - Quality Engineering, 2020 - Taylor & Francis
We review methods for monitoring multivariate time-between-events (TBE) data. We present
some underlying complexities that have been overlooked in the literature. It is helpful to …

Some robust approaches based on copula for monitoring bivariate processes and component-wise assessment

Z Song, A Mukherjee, J Zhang - European Journal of Operational Research, 2021 - Elsevier
In this paper, we develop two adaptive approaches for detecting the signal source in a
bivariate process when a shift occurs in the location vector or the scale matrix or both. The …

Combined Shewhart–EWMA and Shewhart–CUSUM monitoring schemes for time between events

X Hu, F Xia, J Zhang, Z Song - Quality and Reliability …, 2024 - Wiley Online Library
To improve the detecting abilities of upward and downward parameter changes in high‐
quality process, two combined schemes by integrating memory‐type, that is, exponentially …

Continuous production of silver nanoparticles and process control

O Długosz, M Banach - Journal of Cluster Science, 2019 - Springer
The purpose of this research was to prepare silver nanoparticles in a tubular reactor using
tannic acid as both a reducing agent and a stabiliser. The stability of the process was …

Some new real-time monitoring schemes for Gumbel's bivariate exponential time between the events

P Chen, A Mukherjee, W Yang, J Zhang - Computers & Industrial …, 2025 - Elsevier
Monitoring the vector of times between multiple events is essential in a high-quality process
such as healthcare operations. To this end, the multivariate time between events (TBE) …

Multivariate time between events control charts for Gumbel's bivariate exponential distribution with estimated parameters

P Chen, C He, B Liu, J Zhang - Journal of Statistical Computation …, 2024 - Taylor & Francis
The traditional approach of statistical process control is to estimate the in-control parameters
from reference samples obtained in Phase I and then apply them to Phase II monitoring …

Evaluation of Shewhart time‐between‐events‐and‐amplitude control charts for correlated data

D Rahali, P Castagliola, H Taleb… - Quality and Reliability …, 2021 - Wiley Online Library
In recent years, several techniques based on control charts have been developed for the
simultaneous monitoring of the time interval T and the amplitude X of events, known as time …

Multivariate copulas on the MCUSUM control chart

S Sukparungsee, S Kuvattana… - Cogent …, 2017 - Taylor & Francis
The copula approach is a popular method for multivariate modeling applied in several fields;
it defines non-parametric measures of dependence between random variables. In this …

Control charts for monitoring time-between-events-and-amplitude data

P Castagliola, G Celano, D Rahali, S Wu - Control charts and machine …, 2021 - Springer
In recent years, several control charts have been developed for the simultaneous monitoring
of the time interval T and the amplitude X of events, denoted as the TBEA (Time Between …

The efficiency of constructed bivariate copulas for MEWMA and Hotelling's T2 control charts

S Sasiwannapong, S Sukparungsee… - Communications in …, 2022 - Taylor & Francis
A multivariate exponentially weighted moving average (MEWMA) and Hotelling's T2 control
charts are types of multivariate control charts for monitoring the mean vector. In this paper …