Analysis on prediction models of TBM performance: A review

HL Lee, KI Song, GC Cho - Journal of Korean Tunnelling and …, 2016 - koreascience.kr
Prediction of TBM performance is very important for machine selection, and for reliable
estimation of construction cost and period. The purpose of this research is to analyze the …

Prediction of TBM performance based on specific energy

KY Kim, SA Jo, HH Ryu, GC Cho - Geomechanics and …, 2020 - koreascience.kr
This study proposes a new empirical model to effectively predict the excavation performance
of a shield tunnel boring machine (TBM). The TBM performance is affected by the geological …

[图书][B] Development of Improved Algorithms for Detection of Joints and Estimation of Rock Strength in Rock Structures by Using Drilling Parameters of the …

W Liu - 2017 - search.proquest.com
Accurate understanding of geological features, including locations of joints, cracks, bed
separations, and rock strength, allows for optimization of ground support measures and …

[PDF][PDF] TBM 굴진성능예측모델분석: 리뷰

HL Lee, KI Song, GC Cho - 2016 - scholar.archive.org
TBM 을 적용하는 현장에서 장비 선택, 공사기간 및 공사비용의 합리적인 산정을 위하여 TBM 의
굴진성능을 정확하게 예측하는것은 매우 중요한 사안이다. 본 연구에서는 최신 자료들을 …