[图书][B] Construction supply chain management handbook

WJ O'Brien, CT Formoso, V Ruben, K London - 2008 - taylorfrancis.com
Mounting emphasis on construction supply chain management (CSCM) is due to both global
sourcing of materials and a shortage of labor. These factors force increasing amounts of …

[HTML][HTML] Evolución e impacto mundial del Last Planner System: una revisión de la literatura

MF Hoyos, LF Botero - Ingeniería y desarrollo, 2018 - scielo.org.co
El presente artículo pretende dar a conocer el estado actual del conocimiento a nivel
mundial acerca del Last Planner System1 (LPS), sistema de planificación y control de la …

Material delivery problems in construction projects: A possible solution

T Ala-Risku, M Kärkkäinen - International Journal of Production Economics, 2006 - Elsevier
Emerging project management methods for construction projects generate new kinds of
challenges for the delivery process of materials. The rationale of such methods is to create …

Effects of the last planner system on social networks among construction trade crews

V Priven, R Sacks - Journal of construction engineering and …, 2015 - ascelibrary.org
Lean system thinking concerning the mechanics of construction production systems
suggests that the Last Planner System (LPS) improves workflow by creating pull flow and by …

Oportunidades da aplicação do Lean Thinking na construção

FA Picchi - Ambiente construído, 2003 - seer.ufrgs.br
Este trabalho visa identificar, de maneira sistemática, as oportunidades de aplicação do
Lean Thinking (Mentalidade Enxuta) no setor da construção como um todo, bem como …

Barriers faced by new-adopter of Last Planner System®: a case study

AM Perez, S Ghosh - Engineering, Construction and Architectural …, 2018 - emerald.com
Purpose Documented evidence supports the improvements resulting from the use of the
Last Planner System®(LPS) as a lean construction technique; however, several barriers to …

A survey on production planning system in construction projects based on Last Planner System

HD Khanh, SY Kim - KSCE Journal of Civil Engineering, 2016 - Springer
Production planning has a critical role in obtaining project success through improving the
reliability of workflow. Previous studies have shown the effectiveness of production planning …

[HTML][HTML] Implementation del sistema del último planificador en el sector constructor colombiano: Caso de estudio

MF Hoyos Restrepo, LF Botero Botero - Ingeniare. Revista chilena de …, 2021 - SciELO Chile
La filosofía de la construcción sin pérdidas ha sido acogida por numerosas compañías en
Colombia desde hace poco más de una década. Entre las herramientas aplicadas se …

Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects

V Priven, R Sacks - Journal of Construction Engineering and …, 2016 - ascelibrary.org
Despite empirical evidence of the effects of the Last Planner System.(LPS), the mechanisms
by which it works are less well understood. Its strengthening of the social networks within …

Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado

H Olivieri, AD Granja, FA Picchi - Ambiente Construído, 2016 - SciELO Brasil
O modelo tradicional de planejamento adotado por grande parte das empresas construtoras
utiliza como base o método CPM (Critical Path Method). No entanto, devido às limitações …