Scheduling high multiplicity jobs on parallel multi-purpose machines with setup times and machine available times

C Jing, W Huang, L Zhang, H Zhang - Asia-Pacific Journal of …, 2022 - World Scientific
In this paper, we consider the scheduling of high multiplicity jobs on parallel multi-purpose
machines with setup times and machine available times, with the objective of minimizing …

Cyclic lot-sizing problems with sequencing costs

A Grigoriev, VJ Kreuzen, T Oosterwijk - Journal of Scheduling, 2021 - Springer
We study a single-machine lot-sizing problem, where n types of products need to be
scheduled on the machine. Each product is associated with a constant demand rate …

[PDF][PDF] A Mathematical Model for Determining the Optimal Production Lot Size of Multiple Products on a Machine

A Rahimzadeh - Journal of Modern Processes in Manufacturing and …, 2019 - journals.iau.ir
In this research, the production of multi-products using one machine is investigated in
continuous time. The machine has limited capacity and can produce only one product at any …

Approximation Algorithms in Allocation, Scheduling and Pricing

T Oosterwijk - 2018 - cris.maastrichtuniversity.nl
This dissertation examines four optimisation problems. The first chapter examines the
optimisation of network usage to prevent traffic congestion and internet data issues. The …