Understanding service uncertainties in industrial product–service system cost estimation

JA Erkoyuncu, R Roy, E Shehab, K Cheruvu - The International Journal of …, 2011 - Springer
The global transition towards service orientation is posing challenges in cost estimation for
manufacturers driven by the uncertainties that arise at the bidding stage of long-lasting …

The maturing concept of estimating project cost contingency: A review

D Baccarini - AUBEA2006: Proceedings, 2006 - espace.curtin.edu.au
Contingency is a ubiquitous component of project cost estimating. This paper provides a
review of the literature pertaining to the estimating of project cost contingency. It describes …

Intelligent data-driven approach for enhancing preliminary resource planning in industrial construction

L Wu, W Ji, B Feng, U Hermann, S AbouRizk - Automation in Construction, 2021 - Elsevier
Industrial construction is often fast-tracked, with engineering and construction phases
progressing simultaneously. In contrast to projects where detailed engineering information is …

Bayesian inference with Markov chain Monte Carlo–based numerical approach for input model updating

L Wu, W Ji, SM AbouRizk - Journal of Computing in Civil …, 2020 - ascelibrary.org
Stochastic, discrete-event simulation modeling has emerged as a useful tool for facilitating
decision making in construction. Owing to the rigidity inherent to distribution-based inputs …

[HTML][HTML] Construction cost prediction model for conventional and sustainable college buildings in North America

OS Alshamrani - Journal of Taibah University for Science, 2017 - Elsevier
The literature lacks in initial cost prediction models for college buildings, especially
comparing costs of sustainable and conventional buildings. A multi-regression model was …

[PDF][PDF] Systematic review of factors influencing the cost performance of building projects

SJ Odediran, AO Windapo - Postgraduate Conference, 2014 - core.ac.uk
A project is described as successful if the client/owner receives value for money; implies that
project is ultimately completed within the stipulated time, estimated budget and quality …

Holistic analysis and prediction of life cycle cost for vertical greenery systems in Singapore

Z Huang, CL Tan, Y Lu, NH Wong - Building and Environment, 2021 - Elsevier
Recent decades have witnessed the emerging and development of vertical greenery
systems (VGS) or green walls as an alternative to enhance the quality of urban …

Analysis of time, cost, and environmental impact relationships at the building-material level

P Inyim, Y Zhu, W Orabi - Journal of Management in Engineering, 2016 - ascelibrary.org
Recently many studies have shown interest in understanding the relationship between
different project objectives in the context of sustainable development in the architecture …

Conceptual cost estimation of highway bid items–A systematic literature review

B Awuku, E Asa, E Baffoe-Twum… - Engineering …, 2024 - emerald.com
Purpose Challenges associated with ensuring the accuracy and reliability of cost estimation
of highway construction bid items are of significant interest to state highway transportation …

Practices that increase the budget estimate's accuracy during the initial phase of the construction project's life cycle

AA Al Juboori - International Journal of Construction Project …, 2021 - search.proquest.com
Despite the studies intense focus on developing new techniques to improve project budget
estimation, projects still face cost overrun challenges. The project life cycle's initial phase is …