Spread of laterite nickel based on drill data at pt manunggal sarana surya pratama, southeast sulawesi province

M Aswadi, JR Husain, A Gazali… - Journal of Geology …, 2022 - ejournal.insightpublisher.com
Modeling of nickel laterite resources is intended to determine the distribution of resources
represented in the form of block models. The results of resource modeling indicate the …

Classification of Ni Levels for Determination Cut-Off Grade in Region X

N Jafar, H Wahid, S Widodo - Journal of Geology …, 2022 - ejournal.insightpublisher.com
The need for ore with levels above 1.8% presents the author's initiative to conduct research
to produce ore products with the required levels. The aim is to find out the lowest grade of …

Comparative Analysis of Mined Reserve Tonnage on" M" Hill Between Mine Plan and Mining Realization

D Djamaluddin, M Mulhadramy… - Journal of Geology …, 2022 - ejournal.insightpublisher.com
In mining activities, there is often a discrepancy between the plan and actual conditions in
the field; if not identified early, this discrepancy will undoubtedly have the potential to cause …

Analisis Metode Perhitungan Kuantitas Batubara Di Stockpile ROM PT. XYZ

E Harsiga, S Hardianti, AL Hidayat - MINERAL, 2024 - journal.ubb.ac.id
PT XYZ melaksanakan metode on book untuk mengetahui jumlah tonase batubara yang
terdapat di stockpile ROM. Metode ini menggunakan stock awal dari hasil perhitungan …

Efisiensi Kerja Pemboran Eksplorasi Pada PT Vale Indonesia: Efficiency of Exploration Drilling Work at PT Vale Indonesia

H Bakri, AB Thamsi… - Journal of …, 2023 - ejournal.insightpublisher.com
Exploration activities nickel (Ni) which is one of the stages, is where the exploratory drilling
work efficiency is one of the main factors that can describe how good a job has been done …

Analisis Kebutuhan Alat Angkut Dump Truck HD 985 Pada Kegiatan Long-Haul Pengangkutan SSP: Analysis of the Need for Dump Truck Conveyance Equipment HD …

S Widodo, K Kisman… - Journal of …, 2023 - ejournal.insightpublisher.com
Mining activities must always be supported by mechanical equipment that can work
optimally to create satisfactory results with minimal cost and effort. Periodic control must also …

Evaluasi Teknis Perbedaan Kadar Ore Front Penambangan Dengan Pengapalan Di Cv. Akram Mekongga Raya Kabupaten Kolaka Utara Provinsi Sulawesi …

H Djainal, M Djunaidi, AKD Arif - DINTEK, 2022 - jurnal.ummu.ac.id
Tujuan penelitian ini adalah bagaimana menentukan perbedaan kadar sampling ore front
penambangan dengan pengapalan. Sedangkan lokasi daerah penelitian terletak didaerah …