Application of last planner system to modular offshore wind construction

J Lerche, HH Neve, G Ballard, J Teizer… - Journal of …, 2020 - ascelibrary.org
The focus of this study is the applicability of the Last Planner System (LPS) to modular
offshore wind construction. Following a design science approach, a conceptual model for …

Causes of delay in offshore wind turbine construction projects

J Lerche, S Lindhard, P Enevoldsen… - … Planning & Control, 2023 - Taylor & Francis
This research investigated the causes of delays in offshore wind projects, categorizing, and
ranking these factors using statistical analysis. The study presented was based on the …

[HTML][HTML] What can be learned from variability in offshore wind projects

J Lerche, S Lindhard, P Enevoldsen… - Energy Strategy …, 2022 - Elsevier
The focus of this study was to learn from the operational variabilities in offshore wind
projects by investigating the overall delays in offshore wind projects related to arrival time …

Offshore wind project production system: Reducing construction duration through planning

J Lerche - 2020 - pure.au.dk
This thesis demonstrates the importance of understanding a production system, to increase
its productivity through preparation and planning. First categorizing the system, second …

[PDF][PDF] Energy Strategy Reviews

J Lerche, S Lindhard, P Enevoldsen, A Velaayudan… - vbn.aau.dk
The focus of this study was to learn from the operational variabilities in offshore wind
projects by investigating the overall delays in offshore wind projects related to arrival time …