High fidelity modeling of pellet-clad interaction using the CASL virtual environment for reactor applications

KT Clarno, RP Pawlowski… - … and Monte Carlo …, 2015 - inl.elsevierpure.com
The Tiamat code is being developed by CASL (Consortium for Advanced Simulation of Light
Water Reactors) as an integrated tool for predicting pellet-clad interaction and improving the …

PCI analysis of a commercial PWR using BISON fuel performance code

N Capps, M Kennard, W Liu, BD Wirth… - Nuclear Engineering and …, 2017 - Elsevier
Through the early 2000's, nuclear fuel cladding failure resulting from pellet-cladding
interaction in commercial pressurized water reactor fuel was managed successfully by …

Evaluation of missing pellet surface geometry on cladding stress distribution and magnitude

N Capps, R Montgomery, D Sunderland, M Pytel… - … Engineering and Design, 2016 - Elsevier
Missing pellet surface (MPS) defects are local geometric defects in nuclear fuel pellets that
result from pellet mishandling or manufacturing. The presence of MPS defects can cause …

PCI analysis of Zircaloy coated clad under LWR steady state and reactor startup operations using BISON fuel performance code

N Capps, A Mai, M Kennard, W Liu - Nuclear Engineering and Design, 2018 - Elsevier
Research following the earthquake and subsequent tsunami that devastated the Fukushima
Daiichi nuclear power plant, causing severe damage to the reactor cores, has led to the …

Development and Application of 3-D Fuel Performance Modeling to Assess Missing Pellet Surface Influence on Pellet Clad Interaction and Clad Failure

NA Capps - 2016 - trace.tennessee.edu
In the late 1970s PCI related failures caused the implementation of startup ramp restrictions.
These ramp restrictions where intended to reduce the stresses caused by pellet cladding …

Fuel Performance Calculations for FeCrAl Cladding in BWRs

N George, R Sweet, GI Maldonado, BD Wirth… - 2015 - osti.gov
This study expands upon previous neutronics analyses of the reactivity impact of alternate
cladding concepts in boiling water reactor (BWR) cores and directs focus toward contrasting …

[PDF][PDF] Partnerships

OOCE Authority - Cell, 2011 - cfxway.com
In preparing this report, responsibility for accuracy of the data and the completeness and
fairness of the presentation, including all disclosures, rests with the management of the …

[引用][C] Coupled single assembly solution with VERA (problem 6)

S Palmtag - Consortium for advanced simulation of LWRs, Oak …, 2013

[引用][C] Coupled Single Assembly Solution with VERA (Problem 6), Rev

S Palmtag - 2013 - … Report: CASL-U-2013-0140-001

[引用][C] Pellet-Cladding Mechanical Interaction Analyses Using VERA

BT Mervin, ML Pytel, D Hussey - 2015