Green scheduling of distributed two-stage reentrant hybrid flow shop considering distributed energy resources and energy storage system

J Dong, C Ye - Computers & Industrial Engineering, 2022 - Elsevier
In order to build a green manufacturing model and realize energy conservation and
emission reduction, we establish a distributed two-stage reentrant hybrid flow shop bi-level …

Bi‐Objective Re‐Entrant Hybrid Flow Shop Scheduling considering Energy Consumption Cost under Time‐of‐Use Electricity Tariffs

K Geng, C Ye, ZH Dai, L Liu - Complexity, 2020 - Wiley Online Library
Re‐entrant hybrid flow shop scheduling problem (RHFSP) is widely used in industries.
However, little attention is paid to energy consumption cost with the raise of green …

Research on green reentrant hybrid flow shop scheduling problem based on improved moth-flame optimization algorithm

F Xu, H Tang, Q Xun, H Lan, X Liu, W Xing, T Zhu… - Processes, 2022 - mdpi.com
To address the green reentrant hybrid flow shop-scheduling problem (GRHFSP), we
performed lifecycle assessments for evaluating the comprehensive impact of resources and …

Multi‐Objective Reentrant Hybrid Flowshop Scheduling with Machines Turning on and off Control Strategy Using Improved Multi‐Verse Optimizer Algorithm

K Geng, C Ye, L Cao, L Liu - Mathematical Problems in …, 2019 - Wiley Online Library
This paper focuses on the multi‐objective optimization of the reentrant hybrid flowshop
scheduling problem (RHFSP) with machines turning on and off control strategy. RHFSP …

A memetic algorithm for energy-efficient distributed re-entrant hybrid flow shop scheduling problem

K Geng, C Ye - Journal of Intelligent & Fuzzy Systems, 2021 - content.iospress.com
Facing the worsening environmental problems, green manufacturing and sustainable
development have attracted much attention. Aiming at the energy-efficient distributed re …

The dual-resource-constrained re-entrant flexible flow shop a constraint programming approach and a hybrid genetic algorithm

J Mlekusch, RF Hartl - International Journal of Production …, 2024 - Taylor & Francis
The dual-resource-constrained re-entrant flexible flow shop scheduling problem represents
a specialised variant of the flow shop scheduling problem, inspired by real-world scenarios …

分时电价下多目标绿色可重人混合流水车间调度.

耿凯峰, 叶春明, 吴绍兴, 刘丽 - China Mechanical …, 2020 - search.ebscohost.com
针对多目标绿色可重入混合流水车间调度问题(RHFSP) 的特点, 在机器分配和工序排序的基础
上引入分时电价机制, 构建了以最小化最大完工时间, 总能耗成本和碳排放为目标的绿色调度 …

Joint optimisation of uncertain distributed manufacturing and preventive maintenance for semiconductor wafers considering multi-energy complementary

J Dong, C Ye - International Journal of Production Research, 2023 - Taylor & Francis
Aiming at the joint optimisation problem of uncertain distributed manufacturing and
preventive maintenance (PM) for semiconductor wafers considering multi-energy …

考虑节能的改进多目标樽海鞘群算法TFT-LCD 面板阵列制程调度问题.

姚远远, 叶春明 - China Mechanical Engineering, 2019 - search.ebscohost.com
TFTGLCD 面板生产的阵列制程是可重入混合流水车间调度问题, 采用一种改进多目标樽海鞘群
算法对其进行优化求解. 构建以最大完工时间, 总拖期时间和总耗能为优化目标的数学规划模型; …

考虑多源供能波动性的企业生产运作与能源计划耦合优化.

董君, 叶春明 - Application Research of Computers/Jisuanji …, 2024 - search.ebscohost.com
«qJÒ±è\J «Z, 1dÈÐä¹âdqå~¤ éA {.¢ áæ^, íÄïVç, XJ «²dQ]} Ñ, J «[\qn ÿÇÑ. z {R, ãMä¹X¡ ÔKJ
«w-è ½À~ ÚÔÇàj,-£¤, oúÖjéìJ «²d ÚÔÇ× Ø. ñ Zò $ w. ÊH· ½®,×# êrä%®,±²M. 3 {ݽëìHxÄ …