An overview of recovery models and algorithms for real-time railway rescheduling

V Cacchiani, D Huisman, M Kidd, L Kroon… - … Research Part B …, 2014 - Elsevier
This paper presents an overview of recovery models and algorithms for real-time railway
disturbance and disruption management. This area is currently an active research area in …

[HTML][HTML] Handling uncertainty in train timetable rescheduling: A review of the literature and future research directions

S Zhan, J Xie, SC Wong, Y Zhu, F Corman - Transportation Research Part …, 2024 - Elsevier
External and internal factors can cause disturbances or disruptions in daily train operations,
leading to deviations from official timetables and passenger delays. As a result, efficient train …

Timetable coordination in a rail transit network with time-dependent passenger demand

J Yin, A D'Ariano, Y Wang, L Yang, T Tang - European Journal of …, 2021 - Elsevier
With the expansion of urban rail networks and the increase of passengers demand, the
coordination of strongly connected lines becomes more and more important, because …

[HTML][HTML] Resilience assessment of railway networks: Combining infrastructure restoration and transport management

N Bešinović, RF Nassar, C Szymula - Reliability Engineering & System …, 2022 - Elsevier
During railways operations, unplanned events might occur which can result in rail traffic
being heavily impacted. The paper proposes a passenger-centred resilience assessment for …

Train rescheduling for large-scale disruptions in a large-scale railway network

C Zhang, Y Gao, V Cacchiani, L Yang, Z Gao - … Research Part B …, 2023 - Elsevier
This paper studies the problem of rescheduling trains in a large-scale railway network with
the characteristics of long distance, long time horizon and a large number of trains, where a …

The multi-objective railway timetable rescheduling problem

S Binder, Y Maknoon, M Bierlaire - Transportation Research Part C …, 2017 - Elsevier
Unexpected disruptions occur for many reasons in railway networks and cause delays,
cancelations, and, eventually, passenger inconvenience. This research focuses on the …

Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions

Y Zhu, RMP Goverde - Transportation Research Part B: Methodological, 2019 - Elsevier
Railway operations are vulnerable to unexpected disruptions that should be handled in an
efficient and passenger-friendly way. To this end, we propose a timetable rescheduling …

Real-time integrated train rescheduling and rolling stock circulation planning for a metro line under disruptions

Y Wang, K Zhao, A D'ariano, R Niu, S Li… - … Research Part B …, 2021 - Elsevier
More and more unexpected events occur in metro systems, which may cause serious
disturbances and even disruptions for the operation of trains. This paper studies an …

Integrated railway timetable rescheduling and dynamic passenger routing during a complete blockage

S Zhan, SC Wong, P Shang, Q Peng, J Xie… - … Research Part B …, 2021 - Elsevier
Trains normally run as scheduled in a non-disrupted situation. However, due to external
and/or internal factors, trains may deviate from their original timetable during daily …

Integrated optimization of train timetable, rolling stock assignment and short-turning strategy for a metro line

J Yuan, Y Gao, S Li, P Liu, L Yang - European Journal of Operational …, 2022 - Elsevier
In many large cities, metro operations during peak hours are characterized by an
overcrowded and unevenly-distributed passenger demand. This paper introduces a new …