The Implementation of Single Channel Single Phase Queue Model at Gadog Clinic during the COVID-19 Pandemic

I Nurhayati, RT Rinda… - … International Journal of …, 2022 - ejournal2.uika-bogor.ac.id
Queuing is a common thing and often happens in everyday life. Queuing is a phenomenon
that usually occurs when service needs exceed the provided capacity. The number of …

CASH FLOW PLANNING STUDY ON THE HEAVY REHAB PROJECT OF THE ASH SHIRATAL MUSTAQIM TANJUNG GREAT MOSQUE PHASE 1

PD Novita, RH Kartadipura - CERUCUK, 2024 - ppjp.ulm.ac.id
Pengendalian biaya dan waktu sangat penting pada pelaksanaan kegiatan proyek
konstruksi, pengendalian terhadap biaya dan waktu sendiri dilakukan untuk menghindari …

Network Planning Analysis Using The Critical Path Method (CPM) as an Evaluation Tool for Project Planning and Control (Case Study of a Residential House …

DH Rahmat, IAN Kartini - jurnal.untag-sby.ac.id
The construction of residential houses in Pare City Kediri Regency experienced problems in
the construction process was late from the predetermined schedule, which resulted in …

[PDF][PDF] The Application of Floyd-Warshall Algorithm in Solving Shortest Path Problem for Fire Evacuation System at High Rise Building (Case Study at eL Royale Hotel …

AT Bon - ieomsociety.org
Wildfires can happen anytime and anywhere, for example in high rise bulding. In attempt to
control the wildfires, evacuation routes is one of the most important aspects that each …

Performing Dynamic Modeling of Transport Modes Utilization Fraction in Urban Areas A Case of Bekasi City, Indonesia

N NOVIANDI, P Pradono, M TASRIF… - Journal of the Eastern …, 2017 - jstage.jst.go.jp
The classical method of mode utilization prediction in urban scale commonly used the
technique in the form of a mathematical model that is static. Modeling substances generally …

[引用][C] Distribution Cost Optimization Using Average Opportunity Cost Method and Average Total Opportunity Cost Method

L Harianto, S Basriati, E Safitri, Y Muda - Journal of Mathematical Sciences and …, 2024

[引用][C] OPTIMIZING THE SCHEDULING OF THE SURABAYA HEALTH INSPECTION BUILDING CONSTRUCTION PROJECT

H Apriyanto, S Suparno, E Krisdiono, R Susilo - JOURNAL ASRO, 2022