Causes of Landslides in Road Embankment with Retaining Wall and Pile Foundation: A Case Study of National Road Project in Porong-Sidoarjo, Indonesia.

PTK Sari, IB Mochtar - International Journal on Advanced …, 2023 - search.ebscohost.com
This study was conducted to determine the cause of landslides in the toll road embankment
of the national road project in the Porong-Sidoarjo area. The landslide was observed only …

The Evaluation of Pipeline Protection Influenced by Causeway Embankment Using the Finite Element Method (FEM)

M Irmawan, K Yudoprasetyo, AN Refani, K Indrasurya… - Applied Sciences, 2024 - mdpi.com
The construction of embankments over very soft to soft clay, such as reclamation projects, is
on the rise. One such development is the reclamation project in the District Manyar, Gresik …

Alternatif Perencanaan Oprit Jembatan Batanghari (STA 15+ 750) di Jalan Tol Ruas Jambi–Rengat

FI Azami, Y Lastiasih - Jurnal Manajemen Teknologi & Teknik …, 2024 - ojs.unik-kediri.ac.id
Batanghari Bridge is part of the Jambi-Rengat Toll Road, faces significant challenges due its
clay as the topsoil and dominant stratigraphy of sand. These contdition lead to high …

A study on settlements of road embankments on soft ground using vertical drains

TT Dinh - Tạp chí Khoa học Giao thông vận tải, 2024 - tcsj.utc.edu.vn
In civil engineering, the study of embankment settlement on soft ground is a vital
geotechnical task in order to maintain serviceability of the road embankment, pavement, and …

Perbandingan Tinggi awal Timbunan dengan Indeks Kompresi (Cc) Berdasarkan Rumus Empiris Laboratorium Dengan Lapangan

MK Wardani, A Adelia - Prosiding Seminar Nasional Sains dan …, 2022 - ejurnal.itats.ac.id
Perhitungan ketinggian awal timbunan pada teknik perbaikan dengan prekompresi diatas
tanah dasar lunak membutuhkan parameter utama nilai Cc dalam perhitungan. Namun …