A review of scheduling research involving setup considerations

A Allahverdi, JND Gupta, T Aldowaisan - Omega, 1999 - Elsevier
The majority of scheduling research assumes setup as negligible or part of the processing
time. While this assumption simplifies the analysis and/or reflects certain applications, it …

Scheduling and lot sizing with sequence-dependent setup: A literature review

X Zhu, WE Wilhelm - IIE transactions, 2006 - Taylor & Francis
This paper reviews the literature related to the class of scheduling problems that involve
sequence-dependent setup times (costs), an important consideration in many practical …

[图书][B] Scheduling

ML Pinedo - 2012 - Springer
Michael L. Pinedo Theory, Algorithms, and Systems Sixth Edition Page 1 Scheduling Michael L.
Pinedo Theory, Algorithms, and Systems Sixth Edition Page 2 Scheduling Page 3 Michael L …

A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times

E Vallada, R Ruiz - European Journal of Operational Research, 2011 - Elsevier
In this work a genetic algorithm is presented for the unrelated parallel machine scheduling
problem in which machine and job sequence dependent setup times are considered. The …

Multi-agent system and reinforcement learning approach for distributed intelligence in a flexible smart manufacturing system

YG Kim, S Lee, J Son, H Bae, B Do Chung - Journal of Manufacturing …, 2020 - Elsevier
Personalized production has emerged as a result of the increasing customer demand for
more personalized products. Personalized production systems carry a greater amount of …

[图书][B] Production planning and control for semiconductor wafer fabrication facilities: modeling, analysis, and systems

L Mönch, JW Fowler, SJ Mason - 2012 - books.google.com
Over the last fifty-plus years, the increased complexity and speed of integrated circuits have
radically changed our world. Today, semiconductor manufacturing is perhaps the most …

Scheduling aircraft landings—the static case

JE Beasley, M Krishnamoorthy… - Transportation …, 2000 - pubsonline.informs.org
In this paper, we consider the problem of scheduling aircraft (plane) landings at an airport.
This problem is one of deciding a landing time for each plane such that each plane lands …

A crane scheduling method for port container terminals

KH Kim, YM Park - European Journal of operational research, 2004 - Elsevier
This paper discusses the problem of scheduling quay cranes (QCs), the most important
equipment in port terminals. A mixed-integer programming model, which considers various …

A heuristic to minimize the total weighted tardiness with sequence-dependent setups

YH Lee, K Bhaskaran, M Pinedo - IIE transactions, 1997 - Taylor & Francis
We propose a three-phase heuristic for the problem of minimizing the total weighted
tardiness on a single machine in the presence of sequence-dependent setup times. In the …

Scheduling flexible flow lines with sequence-dependent setup times

ME Kurz, RG Askin - European Journal of Operational Research, 2004 - Elsevier
This paper examines scheduling in flexible flow lines with sequence-dependent setup times
to minimize makespan. This type of manufacturing environment is found in industries such …