Short-term planning for open pit mines: a review

M Blom, AR Pearce, PJ Stuckey - International Journal of Mining …, 2019 - Taylor & Francis
This review examines the current state-of-the-art in short-term planning for open-pit mines,
with a granularity that spans days, weeks or months, and a horizon of less than one to two …

A review of machine learning applications for underground mine planning and scheduling

P Chimunhu, E Topal, AD Ajak, W Asad - Resources Policy, 2022 - Elsevier
Production planning and scheduling optimisation for underground mining operations has
continued to attract significant attention over the last decades. This has been necessitated …

[HTML][HTML] Moving towards deep underground mineral resources: Drivers, challenges and potential solutions

Y Ghorbani, GT Nwaila, SE Zhang, JE Bourdeau… - Resources Policy, 2023 - Elsevier
Underground mining has historically occurred in surface and near-surface (shallow) mineral
deposits. While no universal definition of deep underground mining exists, humanity's need …

Operations research in underground mine planning: A review

A Chowdu, P Nesbitt, A Brickey… - INFORMS Journal on …, 2022 - pubsonline.informs.org
At the time of this writing, the US Geological Survey estimates that the average American-
born human will need millions of pounds of fuels, minerals, and other extracted resources in …

Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions

F Sotoudeh, M Nehring, M Kizil, P Knights, A Mousavi - Resources Policy, 2020 - Elsevier
The mining industry continues to face the problem of depleting grades and the subsequent
significant variation in economic, environmental and technological characteristics have been …

Short-term planning optimization model for underground mines

LP Campeau, M Gamache - Computers & Operations Research, 2020 - Elsevier
Scheduling activities in an underground mine is a very complex task. Precedence relations,
the great number of resources and the large number of work sites are some of the reasons …

Underground mine scheduling of mobile machines using constraint programming and large neighborhood search

M Åstrand, M Johansson, A Zanarini - Computers & Operations Research, 2020 - Elsevier
Manual short-term scheduling in underground mines is a time-consuming and error-prone
activity. In this work, we present a Constraint Programming approach capable of automating …

The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)

S Foroughi, JK Hamidi, M Monjezi, M Nehring - Resources Policy, 2019 - Elsevier
Stope layout designing and production scheduling are main phases to determine the
profitability of an underground mining project. These are mainly related to the output of one …

Optimization of trackless equipment scheduling in underground mines using genetic algorithms

H Wang, V Tenorio, G Li, J Hou, N Hu - Mining, metallurgy & exploration, 2020 - Springer
This paper presents an algorithm for optimizing the scheduling of trackless equipment in
underground mines. With the shortest working interval and maximum productivity as goals, a …

A real-world mine excavators timetabling methodology in open-pit mining

SQ Liu, E Kozan, P Corry, M Masoud, K Luo - Optimization and …, 2023 - Springer
In the literature of mining optimisation, most classical mine block sequencing or open-pit
mine production scheduling problems are applied at strategic and tactical levels, because …